Supervision of design and implementation of Works and management of Contracts: "Design and construction of expressway S11 Piła-Poznań, section Ujście – Oborniki, section I Ujście – Budzyń junction (with junction)", "Design and construction of expressway S11 Piła-Poznań, section Ujście – Oborniki, section II Budzyń junction (without junction) – Oborniki (Parkowo)"
Pełnienie nadzoru nad projektowaniem i realizacją Robót oraz zarządzanie Kontraktami pn.: „Zaprojektowanie i wybudowanie drogi ekspresowej S11 Piła-Poznań, odc. Ujście – Oborniki, odc. I Ujście – węzeł Budzyń (z węzłem)”, „Zaprojektowanie i wybudowanie drogi ekspresowej S11 Piła-Poznań, odc. Ujście – Oborniki, odc. II węzeł Budzyń (bez węzła) – Oborniki (Parkowo)”
Poland · Poznań · how to bid here →
Your path to submission
- Deadline: 12 October at 10:00 — 8 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (281 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to NBQ Sp. z o.o..n = 281
- 33% of this buyer's awards went to companies that had already won here before (1,273 awards since 2015, spread over 725 companies). 67% went to new names.n = 1,273 awards since 2015
- The median procedure drew 4 bids (942 procedures with a bid count); 13% ended with a single bidder. Sector: median 4 bids.n = 942
- The award came in at a median 85% of the estimated value (114 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 82%.n = 114
- 5% of awards went to companies from abroad (1,273 awards with a known winner country). Sector average: 1%.n = 1,273
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,995 recorded awards) — mostly from Germany, France, Switzerland.
Submission language: POL.
Typical field: median 7 (from 227 awards).
What the buyer is looking for
The subject of the contract is the provision of services in the field of supervision over the design, management and control as well as supervision over the implementation of contracts concluded as a result of public procurement procedures, the subject of which are: ‘Design and construction of the S11 Piła-Poznań expressway, section Outlet – Manures, section I Ujście – Budzyń junction (with junction)’ and ‘Design and construction of the S11 Piła-Poznań expressway, section Outlet – Manures, section II node Budzyń (without node) – Oborniki (Parkowo)’ under the conditions specified in the Agreement with the Consultant and in accordance with the Contract Terms and Conditions for investment tasks. The service includes the performance of duties by the Consultant in accordance with the Agreement, based on the GTC and SWK, in particular: - supervising the design, verifying the project…
Show full description
… documentation, its completeness, cross-compliance, verifying the results of audit calculations in order to find possible errors, - managing, exercising investor supervision and control over the implementation of works until the date of issue of the Final Payment Certificate, - conducting information and promotion activities related to the implementation of the project and cooperation in this respect with the Ordering Party, including the Branch Director, the Project Manager and the communication position in the GDDKiA Branch, - fulfilling obligations resulting from the procedures included in the applicable requirements / guidelines for investments co-financed from EU funds and the current procedures of the beneficiary of Projects for FEnIKS (or procedures that will be applied in the next EU perspective), - providing investor supervision over the implementation of construction works and participating in warranty inspections and supervising the removal of possible defects / defects found in warranty inspections, as part of the concluded Contract, - supporting the Contracting Authority as a loyal and conscientious advisor in all activities related to the implementation of the Project, - supervising the design works and works in the scope of additional tasks necessary for the implementation of the Project arising during the implementation of the Contract - granted on the basis of the Public Procurement Law Act, - constantly monitoring, conducting and resolving matters related to the proper implementation by individual Contractors, Contractor documents and construction works at the interface of neighbouring Contracts and close cooperation with the Consultant Teams supervising neighbouring investments - as a result of which the Consultant will be obliged to work out the rules and method of proper implementation of the Contractor documents and construction works. If necessary, the Lead Consultant conducting the coordination case at the interface of the Projects will be appointed by the Contracting Authority.
What you must prove — eligibility criteria
Wykonawca musi wykazać: Średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „Przychód netto ze sprzedaży produktów, towarów i materiałów” lub … ▸▾
Wykonawca musi wykazać: Posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 800 000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla posiadanych „środków finanso… ▸▾
Wykonawca musi wykazać się wiedzą i doświadczeniem, w wykonaniu (zakończeniu) w okresie ostatnich 5 lat przed upływem terminu składania ofert/wniosków o dopuszczenie do udziału w postępowaniu, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresi… ▸▾
Wykonawca musi wskazać osoby, które będą uczestniczyć w wykonywaniu zamówienia, legitymujące się kwalifikacjami zawodowymi, doświadczeniem odpowiednim do funkcji, jakie zostaną im powierzone. Wykonawca, na każdą funkcję wymienioną poniżej, wskaże osoby, które … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ZABERD Sp. z o.o. | 18 | 2024–2026 |
| Budimex S.A. | 17 | 2023–2026 |
| ELEKTROTIM S.A. | 14 | 2022–2024 |
| InQubator Sp. z o.o. | 11 | 2024–2026 |
| KM MANAGEMENT GROUP sp. z o.o. | 11 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.