26M0324AOO - OWNER'S REPRESENTATIVE ASSISTANCE FOR THE IMPLEMENTATION OF MONITORING AND MANAGEMENT OF THE DUNANT CONDOMINIUM
26M0324AOO - ASSISTANCE A MAITRISE D'OUVRAGE POUR LA MISE EN OEUVRE DU SUIVI ANIMATION DE LA COPROPRIETE DUNANT
France · Toulouse · how to bid here →
Your path to submission
- Deadline: 30 October at 12:00 — 27 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (126 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to LUGOL*VIRGINIE/.n = 126
- 7% of the bids received came from small and medium-sized enterprises (102 procedures with a bid mix). Sector: 81%.n = 102
- The award came in at a median 43% of the estimated value (86 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 70%.n = 86
- 27% of this buyer's awards went to companies that had already won here before (2,156 awards since 2017, spread over 969 companies). 73% went to new names.n = 2,156 awards since 2017
- The median procedure drew 4 bids (1,183 procedures with a bid count); 9% ended with a single bidder. Sector: median 5 bids.n = 1,183
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In France · Architecture & engineering, 986 contracts went to foreign companies over the last 3 years (of 24,814 recorded awards) — mostly from Germany, Spain, Italy.
Submission language: FRA.
Typical field: median 5 (from 77 awards).
What the buyer is looking for
The purpose of this contract is a project management assistance to implement phase 3 of the Dunant condominium recovery system, namely the monitoring of an Operation for the Improvement of Degraded Condominium Habitat (OPAH CD). The animation follow-up phase aims at the concrete implementation of the recovery operation of the co-ownership. The services are paid for by fixed prices
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ELECTRICITE INDUSTRIELLE J. P. FAUCHE | 12 | 2025–2026 |
| URBANIS | 10 | 2024–2025 |
| EIFFAGE ROUTE GRAND SUD | 9 | 2024–2025 |
| SPIE CITYNETWORKS | 8 | 2018–2025 |
| SNEF | 7 | 2019–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.