SKMMU.086.56.26. - "Employment of workers for the maintenance of railway infrastructure on line no. 250 Gdańsk Główny - Rumia."
SKMMU.086.56.26. - „Zatrudnienie pracowników przy realizacji utrzymania infrastruktury kolejowej linii nr 250 Gdańsk Główny - Rumia.”
Poland · Gdynia · how to bid here →
Your path to submission
- Deadline: 3 November at 12:00 — 30 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 16% of this buyer's awards went to companies that had already won here before (119 awards since 2015, spread over 36 companies). That is well below the sector norm (42%) — this buyer switches suppliers more often than others.n = 119 awards since 2015
- 20% of awards went to companies from abroad (119 awards with a known winner country). Sector average: 0%.n = 119
- The median procedure drew just one bid (86 procedures with a bid count); 60% ended with a single bidder. Sector: median 2 bids.n = 86
- 82% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 68%.n = 9
- Across 7 procedures with structured selection criteria, this buyer most often required: Minimum number of managers (5 of 7), References: works (5 of 7), Equipment, plant and technical facilities (3 of 7), References: services (2 of 7).n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Other services, 3 contracts went to foreign companies over the last 3 years (of 4,528 recorded awards).
Submission language: POL.
Typical field: median 2 (from 699 awards).
What the buyer is looking for
The subject of the contract is the provision by the Contractor to the Contracting Authority of a service consisting in the performance of activities by an employee of the Contractor in the amount of four to eight employees not exceeding the total number of man-hours worked, amounting to 32000 for the entire contract, while maintaining the railway infrastructure of line No 250 Gdańsk Główny – Rumia and other areas managed by the Company.
What you must prove — eligibility criteria
2.2. W zakresie zdolności technicznej lub zawodowej Wykonawca musi wykazać: 2.2.1. że w okresie ostatnich 3 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, należycie wykonał: 1) co najmniej jedno… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PESA Mińsk Mazowiecki S.A. | 5 | 2024–2026 |
| Firma Handlowo Usługowa Tadeusz Kaczor | 4 | 2022–2025 |
| Odlewnia Żeliwa i Metali Nieżelaznych "SPOMEL" Spółdzielnia Pracy | 3 | 2024–2025 |
| Kolejowe Zakłady Usługowe Sp. z o.o. | 3 | 2015–2025 |
| PKP Energetyka S. A. | 3 | 2018–2022 |
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.