Thermomodernization of School and Preschool Complex No. 5 in Białystok, Magnoliowa Street 13, together with ancillary works
Termomodernizacja Zespołu Szkolno-Przedszkolnego Nr 5 w Białymstoku, ul. Magnoliowa 13 wraz z robotami towarzyszącymi
Poland · Białystok · how to bid here →
Your path to submission
- Deadline: 8 October at 10:30 — 5 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (269 awards, most recently August 2026) — by that rhythm the next award was due around September 2026. The last award went to Przedsiębiorstwo Robót Elektrycznych i Budowlanych MIPA Leon Stankiewicz.n = 269
- The median procedure drew 3 bids (288 procedures with a bid count); 23% ended with a single bidder. Sector: median 5 bids.n = 288
- 41% of this buyer's awards went to companies that had already won here before (1,156 awards since 2015, spread over 484 companies). 59% went to new names.n = 1,156 awards since 2015
- The award came in at a median 67% of the estimated value (27 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 27
- 5% of awards went to companies from abroad (1,156 awards with a known winner country). Sector average: 0%.n = 1,156
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 6 (from 11 awards).
What the buyer is looking for
The subject of the contract is the thermal modernization of the building of the School and Pre-school Complex No. 5 in Białystok, ul. Magnolia 13 with accompanying works and the necessary technical infrastructure.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Budownictwa Wodnego „HYDROS” Tadeusz Kulesza, Adam Kulesza Sp. J. | 27 | 2021–2026 |
| Biuro Obsługi Nieruchomości „GEOTAKSACJA” Piotr Gierasimiuk | 26 | 2021–2026 |
| BBGM Sp. z o.o. | 26 | 2022–2026 |
| Wycena Nieruchomości Joanna B. Waluk ̶Pacholska | 17 | 2021–2026 |
| WALMAR Waldemar Gajko | 17 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.