Supply and installation of two new OM–20 L3E and OM–20 P3E milling screens in the Coal Mechanical Processing Plant at JSW S.A. KWK "Knurów-Szczygłowice" Knurów Mine
Dostawa wraz z zabudową dwóch nowych osadzarek miałowych OM–20 L3E oraz OM–20 P3E w Zakładzie Przeróbki Mechanicznej Węgla w JSW S.A. KWK „Knurów-Szczygłowice” Ruch Knurów
Poland · Jastrzębie-Zdrój · how to bid here →
Your path to submission
- Deadline: 7 October at 11:00 — 4 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (90 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to SKANIX P.W. Krystyna Brzezińska.n = 90
- 22% of this buyer's awards went to companies that had already won here before (1,999 awards since 2017, spread over 496 companies). 78% went to new names.n = 1,999 awards since 2017
- The median procedure drew 2 bids (1,723 procedures with a bid count); 36% ended with a single bidder. Sector: median 3 bids.n = 1,723
- 3% of the bids received came from other countries (125 procedures with a bid mix) — all bidders, not just the winners. Sector: 15%.n = 125
- 10% of awards went to companies from abroad (1,999 awards with a known winner country). Sector average: 1%.n = 1,999
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 28/09/2026.
Foreign bidders
In Poland · Mining & construction machinery, 22 contracts went to foreign companies over the last 3 years (of 3,260 recorded awards) — mostly from Czechia, Belgium, Germany.
Submission language: POL.
Typical field: median 3 (from 81 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (PL).
Show original description (PL)
Szczegółowy opis przedmiotu zamówienia zawiera Specyfikacja techniczna stanowiąca załącznik nr 1 do SWZ
What you must prove — eligibility criteria
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| GRENEVIA S.A. | 38 | 2024–2026 |
| MAS Sp. z o.o. | 18 | 2024–2026 |
| LINTER S.A. | 16 | 2024–2026 |
| PMT POLSKA Sp. z o.o. | 13 | 2024–2025 |
| Minova Ekochem Sp. z o.o. | 11 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.