How to bid in this country: portals, deadlines, thresholds →
Carpentry Lecture Hall Seating, Saarland University, Homburg Campus, New Prosectorium / Preparation Building
Tischler Hörsaalbestuhlung, Universität des Saarlandes, Campus Homburg, Neubau Prosektur / Präparation — original title
Your path to submission
- Deadline: 9 November at 09:30 — 8 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: German.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
Carpenter Lecture Hall Seating Delivery and assembly Lecture Hall Seating · Approximately 330 seats Circa 4 wheelchair seats
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (102 awards, most recently March 2025) — by that rhythm the next award was due around June 2025. The last award went to Grebenauer Metallbau Schreiner GmbH.n = 102
- 17% of this buyer's awards went to companies that had already won here before (116 awards since 2018, spread over 96 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 116 awards since 2018
- The median procedure drew 4 bids (115 procedures with a bid count); 9% ended with a single bidder. Sector: median 4 bids.n = 115
- From notice to award takes a median 26 days here (5 procedures). Sector: 84 days.n = 5
- Across 6 procedures with structured selection criteria, this buyer most often required: References: works (6 of 6), Minimum annual turnover (6 of 6), Trade register enrolment (6 of 6).n = 6
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
What you must prove — eligibility criteria
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| MBW Luft- u. Klimatechnische Anlagen GmbH · Rehlingen | 3 | 2021–2023 |
| Elektro Pabst UG & Co. KG · Nohfelden | 3 | 2021–2023 |
| Karl Heinen GmbH · Saarbrücken | 3 | 2020–2021 |
| Grebenauer Metallbau Schreiner GmbH · Grebenau | 3 | 2023–2025 |
| Bard & Beckmann GmbH · Tholey | 3 | 2021 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 104 completed awards — not a statement about this procedure.)
This procedure allows 41 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
Submission language: German.
How to bid
Guide: how to apply on cosinex Vergabemarktplatz / DTVP → Registration, signature, fees — from the operator's bidder manual.
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now