How to bid in this country: portals, deadlines, thresholds →
Energy services with guarantee (epc) for the implementation of an energy saving project in selected buildings of the statutory city of české budějovice
Energetické služby se zárukou (epc) pro realizaci projektu energetických úspor ve vybraných objektech statutárního města české budějovice — original title
Your path to submission
- Deadline for requests to participate: 2 November at 10:00 — 1 day left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Czech.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the public contract is the provision of energy services with a guaranteed result pursuant to Section 10e(4) of Act No 406/2000 on energy management, as amended, consisting of: carrying out preliminary activities; b) in the elaboration of the necessary project documentation for the implementation of austerity measures c) in ensuring the formalities associated with obtaining a building permit; implementation of basic energy-saving measures; e) in the elaboration of documentation of the actual implementation of austerity measures; elaboration of operating rules for newly installed equipment and training of operators; g) in the provision of energy management h) in the provision of a guarantee for the achievement of contractually guaranteed savings. (hereinafter referred to as ‘the project’) in order to achieve an increase in energy efficiency and a reduction in operating costs…
Show full description
… in the premises of the contracting authority. The implementation of the project will be carried out in the following stages: a) Stage I: preliminary activities (verification of the state of energy use in buildings); Stage II: elaboration of necessary project documentation for the implementation of savings measures, implementation of basic energy-saving measures (see in particular Part Three of the contract), including elaboration of documentation of actual implementation of savings measures and elaboration of operating rules for newly installed equipment and operator training; Stage III: the provision of energy management and guarantees, including, in particular, the annual preparation of a report on the savings achieved, the provision of energy management, continuous evaluation of savings and the provision of a guarantee for the achievement of contractually guaranteed savings, the proposal and, after the consent of the contracting authority, the implementation of additional energy-saving measures, including the implementation and financial settlement of additional measures. The contract will be implemented using the Energy Performance Contracting (EPC) method. This is a comprehensive public contract involving the preparation, implementation and subsequent long-term monitoring and evaluation of the results of the implemented energy-saving measures, whereby the contractor provides the contracting authority with a guarantee for achieving the expected economic benefits. Concrete energy-saving measures will be proposed by the supplier himself and included in the EPC project, which will then be implemented in selected buildings. The proposed energy-saving measures will include, according to the contracting authority's assumptions, the area of heating, building measures improving the thermal and technical properties of buildings, lighting, consumption of hot or cold water, etc. The content of the preparatory work is a complete design and engineering activity for obtaining a building permit (if necessary) and the subsequent delivery, installation and commissioning of the energy-saving measures (with the submission of documentation for the building permit and documentation of the actual construction). Savings will be contractually guaranteed, continuously monitored, evaluated and documented by the supplier. The contracting authority envisages the co-financing of the subject-matter of the public contract under the 102nd call of the Ministry of the Environment under the Operational Programme Environment (hereinafter also referred to as the ‘Environmental Programme’). The contractor bears the relevant risk of failure in achieving savings through the implementation of the measures proposed and implemented by the contractor, including the risk of reducing the possible subsidy from the OP Environment due to the project parameters guaranteed and not fulfilled by the contractor. The contracting authority does not expect the equipment in question to be rented by the selected supplier or to be operated. The subject of the tender is also not the procurement of energy by the supplier or the sale of thermal energy to the contracting authority. The annexes to this tender specifications contain a more detailed specification of the objects which are the place of performance of the public contract. The contracting authority states that further details regarding the conditions of performance of the contract may be further discussed with qualified participants who submit preliminary tenders at the next stage of the procurement procedure, and the contracting authority will be entitled to do so in accordance with the provisions of the Act. Section 61(10) of the Act also lays down other binding terms and conditions during the negotiations, which participants must respect in their tenders. The time of submission of preliminary tenders will be specified at the next stage of the procurement procedure, i.e. in the invitation to submit preliminary tenders within the meaning of the Act. Section 61(5)
Contract
Type of service
Clement What the numbers say about this buyer
- 22% of this buyer's awards went to companies that had already won here before (305 awards since 2015, spread over 65 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 305 awards since 2015
- In this sector the buyer awards roughly every 3 months (47 awards, most recently June 2026) — by that rhythm the next award was due around September 2026. The last award went to AP2projekt s.r.o.n = 47
- The median procedure drew 2 bids (253 procedures with a bid count); 42% ended with a single bidder. Sector: median 4 bids.n = 253
- The award came in at a median 71% of the estimated value (41 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 41
- 11% of awards went to companies from abroad (305 awards with a known winner country). Sector average: 8%.n = 305
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 26/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| LION - stavební a obchodní společnost, spol. s r.o. | 13 | 2021–2025 |
| VORS spol. s r. o. | 9 | 2022–2025 |
| AP2projekt s.r.o. | 8 | 2022–2026 |
| TERA Systems s.r.o. | 7 | 2022–2026 |
| SWARCO TRAFFIC CZ s.r.o. | 7 | 2015–2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 4 bids came in. A normal field for this market. (Based on 38 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Czechia · Architecture & engineering, 456 contracts went to foreign companies over the last 3 years (of 16,225 recorded awards) — mostly from Germany, France, Austria.
Submission language: Czech.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.