Execution Works for the Investment Objective "Rehabilitation, Modernization and Consolidation of Secondary School No. 178"
Lucrări de execuție privind obiectivul de investitii „Reabilitarea, modernizarea și consolidarea Școlii Gimnaziale nr. 178”
Romania · Bucuresti · how to bid here →
Your path to submission
- Deadline: 6 October at 15:00 — 3 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew 12 bids (171 procedures with a bid count); 6% ended with a single bidder. Sector: median 5 bids.n = 171
- In this sector the buyer awards roughly every month (131 awards, most recently November 2024) — by that rhythm the next award was due around January 2025. The last award went to VIOSIL INSTALCONSTRUCT S.R.L..n = 131
- 53% of this buyer's awards went to companies that had already won here before (439 awards since 2021, spread over 194 companies). 47% went to new names.n = 439 awards since 2021
- 15% of the bids received came from other countries (159 procedures with a bid mix) — all bidders, not just the winners. Sector: 2%.n = 159
- Across 21 procedures with structured selection criteria, this buyer most often required: Share of subcontractors (21 of 21), References: works (20 of 21), Average minimum annual turnover (16 of 21), Trade register enrolment (16 of 21).n = 21
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Romania · Construction work, 161 contracts went to foreign companies over the last 3 years (of 77,851 recorded awards) — mostly from France, Italy, Germany.
Submission language: RON.
Typical field: median 15 (from 98 awards).
What the buyer is looking for
The subject-matter of the contract resulting from the present proceedings is the execution of the works relating to the investment objective ‘Rehabilitation, modernisation and consolidation of Secondary School No 178, Str. Dridu No 2, Sector 1, Bucharest’. The contract includes the complete execution of all the works stipulated in the technical documentation, as well as all the activities necessary for their realization, completion, reception and delivery in conditions of quality, safety and functionality. In this respect, the Contractor shall be required to carry out construction and installation works, including works to: • structural consolidation; • architectural rehabilitation and modernisation; • increased energy performance; • modernization of installations (electrical, sanitary, thermal, HVAC, anti-burglary, access control, surveillance, detection, BMS); • exterior fittings and…
Show full description
… related works; The basis for determining the estimated value of the contract was the Lists of quantities elaborated in the technical project: Chapter 1.2. Land development – RON 398 227.00 excluding VAT Chapter 4.1 Constructions and installations – RON 31 833 948.27 excluding VAT Chapter 4.2 Installation of machinery and technological equipment – RON 1006 311.51 Cap4.3 Machinery, technological and functional equipment requiring installation – RON 4 643 937.06 excluding VAT Chapter 5.1.1 Construction works and installations relating to the organisation of the construction site – RON 773 863.86 excluding VAT. Chapter 5.1.2 Expenses related to site organisation – RON 157 185.88 excluding VAT Chapter 6.2. Technological tests and tests – RON 25,000 excluding VAT
What you must prove — eligibility criteria
Operatorii economici ce depun oferta trebuie sa dovedeasca o forma de inregistrare in conditiile legii din tara de rezidenta si sa reiasa ca operatorul economic este legal constituit, ca nu se afla in niciuna dintre situatiile de anulare a constituirii precum … ▸▾
Se solicită ca media cifrei de afaceri totală (anuală) pentru ultimele 3 exerciții financiare disponibile (2023, 2024, 2025), a operatorului economic, să fie de cel puțin 38.800.000,00 lei sau echivalentul în altă monedă. Pentru conversia în lei, dacă situații… ▸▾
Cerința nr. 1: Experiența similară Lista principalelor lucrări similare executate în cursul unei perioade care acoperă cel mult ultimii 5 ani, raportați la data-limită de depunere a ofertei stabilită inițial prin anunțul de participare, cu indicarea valorilor,… ▸▾
Cerința 1- ISO 9001 Dovada implementarii sistemului de management al calitatii prin prezentarea unor certificate valabile de asigurare a calitatii - ISO 9001 sau echivalent, pentru activitatea de aferenta obiectului contractului, emise de organisme de certific… ▸▾
Dovada implementarii sistemului de management al mediului prin prezentarea unor certificate valabile care atesta respectarea standardelor de protectie a mediului - ISO 14001 sau echivalent, pentru activitatea aferenta obiectului contractului, emise de organism… ▸▾
În cazul în care are intenția să subcontracteze parte/ părți din contract, ofertantul are obligația de a preciza partea/ părțile din contract pe care urmează să le subcontracteze și datele de recunoaștere ale subcontractanților propuși. Modalitatea de îndeplin… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| RO 1316 SERVICE AUTO SERUS S.R.L. | 9 | 2024 |
| Stefadina Comserv | 8 | 2024–2026 |
| CONTROL SURVEY | 7 | 2024–2026 |
| SC THEOTOP SRL | 7 | 2024–2026 |
| DTG ALFA | 7 | 2024–2026 |
How often this buyer tenders this