Supply of renewable energy installations under the Project entitled "Investment activities related to the construction of the Energy Cluster infrastructure of Rycki County"
Dostawa instalacji OZE w ramach Przedsięwzięcia pn. „Działania inwestycyjne w zakresie budowy infrastruktury Klastra Energii Powiatu Ryckiego”
Poland · Ryki · how to bid here →
Your path to submission
- Deadline: 7 October at 11:00 — 4 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL, POL, POL, POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- The median procedure drew just one bid (13 procedures with a bid count); 85% ended with a single bidder. Sector: median 3 bids.n = 13
- 22% of this buyer's awards went to companies that had already won here before (164 awards since 2019, spread over 122 companies). 78% went to new names.n = 164 awards since 2019
- Across 13 procedures with structured selection criteria, this buyer most often required: Staff qualifications (12 of 13), References: supplies (9 of 13), Independent quality certificate (e.g. ISO 9001) (7 of 13), References: services (4 of 13).n = 13
- 2% of awards went to companies from abroad (164 awards with a known winner country). Sector average: 2%.n = 164
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/10/2026.
Foreign bidders
In Poland · Electrical machinery, 88 contracts went to foreign companies over the last 3 years (of 8,207 recorded awards) — mostly from Germany, France, Italy.
Submission language: POL.
Typical field: median 3 (from 1,413 awards).
What the buyer is looking for
The subject-matter of the contract includes delivery, assembly and commissioning of: 1) 891 pcs. of photovoltaic installations, constituting a source of electricity generation from RES together with infrastructure enabling drainage of produced energy . 2)155 units of energy storage units coupled to RES power generation units, 3)479 units of heat pump installations coupled to existing PV installations. The subject of the contract was divided into three tasks, described in Chapter 6 of the FTZ. The subject of the contract also includes the design of the installation of photovoltaic installations, energy storage and heat pumps (development of technical projects). This contract is intended for use by natural persons, including the Employer's employees, in connection with the above description of the subject of the contract, was drawn up taking into account accessibility requirements for…
Show full description
… disabled persons and design for all users (in accordance with Art. 1 of the PPL Act). A detailed description of the subject-matter of the contract is provided in Annex 1 to the FTZ – Functional and Utility Programme. Annex 1 contains documents referring to the three tasks described in Chapter 6 of the FTZ.1) Task 1: a) Construction of 2 photovoltaic installations on public buildings and 83 on residential buildings. The scope of this task includes the design, delivery and installation of 85 photovoltaic installations in the Commune of Nowodwor (83 for residential buildings, 2 for public buildings). As part of the task, technical projects will be prepared for each of the facilities covered by the project. b) Construction of 14 electricity storage facilities (residential buildings) coupled with renewable energy generation units. The scope of the task includes design, delivery, installation of 14 energy storage facilities in the Nowodwor Commune (residential buildings). As part of the task, technical projects will be prepared for each of the facilities covered by the project. c) Construction of 35 heat pumps (residential buildings) coupled to existing installations. The scope of the task includes design, delivery, installation of 35 heat pumps in the Commune of Nowodwor (residential buildings). As part of the task, technical projects will be prepared for each of the facilities covered by the project. 2) Task 2: a) Construction of 13 photovoltaic installations on public buildings and 660 on residential buildings in the area of the energy cluster - Ryki Commune. The scope of the task includes design, delivery, installation of 673 installations in the Ryki Commune (660 for residential buildings, 13 for public buildings). As part of the task, technical projects will be prepared for each of the facilities covered by the project. b) Construction of 125 electricity storage facilities (112 residential buildings, 13 public buildings) coupled with renewable energy generation units. The scope of the task includes the design, delivery, installation of 125 energy storage facilities in the Ryki Commune (112 residential buildings, 13 public buildings). As part of the task, technical projects will be prepared for each of the facilities covered by the project. c) Construction of 375 heat pumps (373 residential buildings, 2 public buildings) coupled to existing installations. The scope of the task includes the design, delivery, installation of 375 heat pumps in the Ryki Commune (373 residential buildings, 2 public buildings). As part of the task, technical projects will be prepared for each of the facilities covered by the project. 3) Task 3: a) Construction of 4 photovoltaic installations on public buildings and 129 on residential buildings in the area of the energy cluster - Municipality of Kłoczew. The scope of the task includes the design, delivery, installation of 133 installations in the Kłoczew Commune (129 for residential buildings, 4 for public buildings). As part of the task of preparation
What you must prove — eligibility criteria
W odniesieniu do sytuacji finansowej lub ekonomicznej Zamawiający uzna warunek za spełniony jeśli Wykonawca wykaże posiadanie zdolności kredytowej lub środków finansowych w wysokości minimum 5 000 000 złotych (pięć milionów złotych 0/100). Ocena spełnienia teg… ▸▾
a) Zamawiający uzna warunek za spełniony, jeżeli Wykonawca wykaże, że należycie wykonał w okresie ostatnich 5 (pięciu) lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie, wykonał co najmniej: i) 1 (j… ▸▾
b) Zamawiający uzna warunek za spełniony, jeżeli Wykonawca wykaże, że skieruje do wykonania zamówienia (dysponuje lub będzie dysponował na czas realizacji zamówienia) osoby, które będą uczestniczyć w wykonywaniu zamówienia, legitymującymi się doświadczeniem od… ▸▾
O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy: a) spełniają wymagania norm zarządzania jakością, odpowiadających normie ISO 9001, oraz potwierdzonych certyfikatem wydanym przez podmiot akredytowany zgodnie z Rozporządzeniem Parlamentu Europejskieg… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Robót Drogowych Lubartów S.A. | 6 | 2025–2026 |
| PRZEDSIĘBIORSTWO ROBÓT DROGOWYCH LUBARTÓW SPÓŁKA AKCYJNA | 5 | 2022–2024 |
| PGKiM w Rykach Sp. z o.o. | 4 | 2021–2024 |
| Przedsiębiorstwo Budowlano-Handlowo-Transportowe PeZet-BUD Piotr Zdun | 4 | 2021–2024 |
| P.H.U. CAREX Grzegorz Domagała | 3 | 2021–2026 |