Friedrich & ClementBETA

How to bid in this country: portals, deadlines, thresholds →

New Construction of Fire Station Guntersblum

Neubau Feuerwehrgerätehaus Guntersblum — original title

DEGermany · Oppenheim

Your path to submission

  1. Deadline: 2 November at 09:30 — 1 day left.
  2. The submission point is stated in the notice (link on this page).
  3. Offer and evidence in: German.
  4. Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

What the buyer is looking for

Construction logistics, construction site equipment for the AG (to be provided from 26.04.2027 to 17.11.2028) - container system with 2 sanitary containers, 2 individual containers, interrogator (4 containers) - construction electricity and construction water Civil engineering: (Version 11.01.2027 to 27.08.2026) - Removing and disposing of soil 1,550 m3 - Site construction, load-bearing layers 8,000 m3 - Line ditches 1,500 m3 - Drinking water pipe 330 m - Rainwater pipe 170 m - Sewage pipes 350 m - ELT empty pipes 70m - Separators and various shafts - Stb foundations, floor slabs 580 m3 - Stb walls and supports 220 m3

Machine translation (EU eTranslation) — official wording via the PDF link.

Contract

TypeWorks
Estimated valuevalue not published
Published28 Sept 2026
ProcedureOpen procedure
Place of performanceGuntersblum

Type of service

45 · Construction work
CPV 45223220

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (22 awards, most recently October 2026) — the next award is due around December 2026 by that rhythm. The last award went to IB Steintechnik GmbH.n = 22
  • 21% of this buyer's awards went to companies that had already won here before (63 awards since 2018, spread over 49 companies). That is well below the sector norm (40%) — this buyer switches suppliers more often than others.n = 63 awards since 2018
  • The median procedure drew 3 bids (62 procedures with a bid count); 19% ended with a single bidder. Sector: median 4 bids.n = 62
  • 100% of the bids received came from small and medium-sized enterprises (9 procedures with a bid mix). Sector: 87%.n = 9
  • Not one of the 63 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 63

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Selection criteria — not structured in the notice

The buyer left the criteria block of the EU form empty; the eligibility requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in German.

Tender documents — direct download

⤓
Annex 1
Specifications and annexes at the buyer — usually viewable without registration
⤓
Administrative conditions
The full notice, official wording

Who has won at this buyer so far

Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.

CompanyAwardsPeriod
CONSTRATA Ingenieur-Gesellschaft mbH · Bielefeld32024
Auto-Pieroth GmbH & Co. KG · Bingen32025
WISS GmbH & Co. KG · Herbolzheim32025
Krämer-Evers Bauphysik GmbH & Co. KG · Hasbergen22026
hofmann_röttgen Landschaftsarchitekten bdla · Limburgerhof22026
From the recorded awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this kind of work

28
2020
32
2021
5
2022
2
2023
34
2024
51
2025
54
2026
206 procedures in this category since 2019. Public procurement repeats itself — those who know the rhythm prepare instead of reacting.

Contracting authority contact

·
Deadline — Monday 2 November at 09:30

Tactics

When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 22 completed awards — not a statement about this procedure.)

This procedure allows 35 days between publication and deadline — typical in this country is 32 (median of 20,496 procedures). A normal window for this market.

The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.

Foreign bidders

In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.

Submission language: German.

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

How to bid

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.
This procedure is published on 2 portals
All known sources are notice services. The buyer names the submission point in the notice itself.
Put together the evidence — in German
Certificates, references and your price — as set out in the notice.
Submit via TED — Tenders Electronic Daily before the deadline
Electronic submission — allow time for the portal registration the first time.
To the procurement portal →Official notice on TED →
We pull data from millions of notices. If the link here does not work, report it — we will find the right one.

Don't miss the next one

Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.

Register now