How to bid in this country: portals, deadlines, thresholds →
Dry construction work (VE17)
Trockenbauarbeiten (VE17) — original title
Your path to submission
- Deadline: 2 November at 07:00 — 1 day left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: German.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
VE17: Drywall works: - Partition walls and overlays, double-planed, as non-load-bearing lightweight walls, incl. connections at the bottom and sides rigid, generally sliding at the top - Ceilings with plasterboard coverings as well as curtain ceilings, ceiling sails and baffles with wood wool lightweight panel coverings and cantilevered metal grid ceilings - Clothing for special components such as stair reinforcements, niche training and roof window cables - in each case incl. installation elements, edge profiles and substructure reinforcements
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew just one bid (9 procedures with a bid count); 56% ended with a single bidder. Sector: median 4 bids.n = 9
- 38% of this buyer's awards went to companies that had already won here before (9 awards since 2018, spread over 6 companies). 62% went to new names.n = 9 awards since 2018
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in German.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Hans Fuchs Bauunternehmen Ellwangen GmbH & Co. KG · Ellwangen Jagst | 2 | 2026 |
| Albert Ziegler GmbH | 2 | 2014–2018 |
| Wacker GmbH · Berlin | 2 | 2026 |
| D&K Spezial Tiefbau GmbH & Co. KG · Bad Grönenbach | 2 | 2026 |
| Industriebau Wernigerode GmbH · Wernigerode | 1 | 2017 |
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 7 completed awards — not a statement about this procedure.)
This procedure allows 35 days between publication and deadline — typical in this country is 32 (median of 20,071 procedures). A normal window for this market.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Germany · Construction work, 687 contracts went to foreign companies over the last 3 years (of 244,229 recorded awards) — mostly from Austria, France, Poland.
Submission language: German.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.