How to bid in this country: portals, deadlines, thresholds →
VZ 63.26 Processing of project documentation "ZŠ Horymírova – building insulation ŠD"
VZ 63.26 Zpracování projektové dokumentace „ZŠ Horymírova – zateplení budovy ŠD“ — original title
Your path to submission
- Deadline: 4 November at 10:00 — 3 days left.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Czech, Slovak.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the public contract is the elaboration of project documentation (DPZ and DPS) for the implementation of thermal insulation of the building ŠD at elementary school at ul. Horymírova 100 in Ostrava-Zábřeh. PD will include thermal insulation of the perimeter walls of the building, thermal insulation of the roof, replacement of gutters, replacement of all windows and doors. Part of it will be the repair of gutter pavements.
Contract
Type of service
Clement What the numbers say about this buyer
- 31% of this buyer's awards went to companies that had already won here before (358 awards since 2015, spread over 76 companies). That is well below the sector norm (77%) — this buyer switches suppliers more often than others.n = 358 awards since 2015
- In this sector the buyer awards roughly every 2 months (90 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to MAZOK s.r.o.n = 90
- The award came in at a median 92% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 76%.n = 18
- The median procedure drew 4 bids (314 procedures with a bid count); 28% ended with a single bidder. Sector: median 4 bids.n = 314
- 7% of awards went to companies from abroad (358 awards with a known winner country). Sector average: 8%.n = 358
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 25/10/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Czech, Slovak.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| VYKRUT zahradní služby a.s. | 16 | 2022–2025 |
| Adam Gebauer | 12 | 2023 |
| Aleš Juřina | 12 | 2024–2026 |
| ARMIPADO spol. s.r.o. | 10 | 2024–2026 |
| ČECH - ENGINEERING, a.s. | 8 | 2024–2026 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, there was usually a single bid in the end. A solid bid has a real chance here. (Based on 85 completed awards — not a statement about this procedure.)
This procedure allows 40 days between publication and deadline — typical in this country is 32 (median of 1,134 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Czechia · Architecture & engineering, 456 contracts went to foreign companies over the last 3 years (of 16,225 recorded awards) — mostly from Germany, France, Austria.
Submission language: Czech, Slovak.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now