"Preparation of design documentation for the construction of a municipal road together with the construction of a bridge to Wyspa Wielka Żuława"
„Wykonanie dokumentacji projektowej budowy drogi gminnej wraz z budową mostu na Wyspę Wielka Żuława”
Poland · Iława · how to bid here →
Your path to submission
- Deadline: 6 October at 09:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (66 awards, most recently June 2026) — by that rhythm the next award was due around August 2026. The last award went to Pracownia Projektowa Dariusz Ogonowski.n = 66
- 47% of this buyer's awards went to companies that had already won here before (258 awards since 2015, spread over 127 companies). That is well above the sector norm (34%) — newcomers have a harder time here than elsewhere.n = 258 awards since 2015
- The median procedure drew 3 bids (24 procedures with a bid count); 25% ended with a single bidder. Sector: median 4 bids.n = 24
- 2% of awards went to companies from abroad (258 awards with a known winner country). Sector average: 0%.n = 258
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.
Foreign bidders
In Poland · Architecture & engineering, 111 contracts went to foreign companies over the last 3 years (of 39,995 recorded awards) — mostly from Germany, France, Switzerland.
Submission language: POL.
Typical field: median 4 (from 4,644 awards).
What the buyer is looking for
1. The scope of the investment includes the preparation of design documentation for the construction of a municipal road from the roundabout along Sienkiewicza Street (intersection of national road No. 16 with provincial road No. 521) to Wielka Żuława Island with the necessary infrastructure. The scope of the contract includes the execution of documentation together with obtaining all the arrangements, opinions and decisions necessary to carry out the works. 2. The documentation should be carried out on the basis of the provisions of the Act of 10 April 2003 on special rules for the preparation and implementation of investments in the field of public roads (Journal of Laws of 2024, item 311) 3. OBLIGATORY LOCAL VISION BEFORE THE OFFER
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| WZUPiH SPOMER Sp. z o.o. | 25 | 2021–2026 |
| Pracownia Projektowa Dariusz Ogonowski | 25 | 2021–2026 |
| Bank Gospodarstwa Krajowego | 7 | 2021–2025 |
| Przedsiębiorstwo Usługowe Robót Energetycznych PERIMEX | 7 | 2021–2025 |
| Usługi Remontowo-Budowlane Artur Jeziorski | 6 | 2021–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.