Engineering supervision over the execution of the executive design for HVAC systems and comprehensive construction works on tracks no. 623 and no. 628 on section I+K near Fornale – Szczyrzyc and near Porąbka - near Stróża within the project entitled "Construction of a new railway line Podłęże – Szczyrzyc – Tymbark/Mszana Dolna and modernization of existing railway line no. 104 Chabówka – Nowy Sącz – Stage II"
Pełnienie nadzoru inżynierskiego nad realizacją projektu wykonawczego branży srk oraz kompleksowych robót budowlanych na lk nr 623 i nr 628 na odcinku I+K podg. Fornale – Szczyrzyc i podg. Porąbka - podg. Stróża w ramach projektu pn. „Budowa nowej linii kolejowej Podłęże – Szczyrzyc – Tymbark/Mszana Dolna oraz modernizacja istniejącej linii kolejowej nr 104 Chabówka – Nowy Sącz – Etap II"
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 13 October at 10:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (146 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Transprojekt Gdański Sp. z o.o..n = 146
- 18% of this buyer's awards went to companies that had already won here before (1,657 awards since 2015, spread over 551 companies). That is well below the sector norm (34%) — this buyer switches suppliers more often than others.n = 1,657 awards since 2015
- 18% of the bids received came from other countries (145 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 145
- 15% of awards went to companies from abroad (1,657 awards with a known winner country). Sector average: 1%.n = 1,657
- 52% of the bids received came from small and medium-sized enterprises (145 procedures with a bid mix). Sector: 84%.n = 145
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 05/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,057 recorded awards) — mostly from Germany, France, Switzerland.
Submission language: POL.
Typical field: median 6 (from 80 awards).
What the buyer is looking for
The purpose of this contract is to manage and supervise the implementation of the Investment Task, in particular: a) Performing the function of an Engineer in accordance with the Contract and the Construction Contract; b) Material and financial management, in particular comprehensive service of the Construction Contract in terms of their settlement, monitoring and material and financial reporting; c) Technical management, including the performance of the duties of the Investor Supervision Inspector for the Construction Contract; d) Management of the Construction Contract; e) Conducting environmental supervision (in the scope of control of the impact of the construction process on surface and groundwater, noise, air, ground surface, waste management, greenery management, control of the construction stage in terms of the use of efficient machinery and equipment and their proper operation…
Show full description
… and maintenance, use of means of transport and machinery without overloading and overloading, discharging machinery after completed work and in the event of failure to a designated parking place) and natural supervision, in accordance with the decision on environmental conditions, provisions agreeing on the conditions for the implementation of the project and other administrative decisions in this respect. The scope of the contract also includes the following Term Option Rights – extending the implementation of the contract to 12 months related to the implementation of construction works, as described in the Contract. Detailed Description of the subject of the Order can be found in Volume III of the SWZ (“OPZ”)
What you must prove — eligibility criteria
W zakresie warunku określonego w punkcie 8.2.2. IDW wymagane jest wykazanie przez Wykonawcę wykonanie, w okresie ostatnich 10 lat przed upływem terminu składania ofert, (a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie), co najmniej 1 (jedn… ▸▾
W zakresie warunku określonego w punkcie 8.2.2. IDW wymagane jest wykazanie przez Wykonawcę dysponowaniem osobami wchodzącymi w skład Stałego Zespołu Inżyniera, zgodnie z poniższym wyszczególnieniem: a) Inżynier Projektu b) Inżynier Rezydent; c)Koordynator zes… ▸▾
W zakresie warunku określonego w pkt. 8.2.1. IDW, wymagane jest wykazanie przez Wykonawcę, iż znajduje się w sytuacji ekonomicznej lub finansowej zapewniającej wykonanie Zamówienia, tj.: a) posiada środki finansowe lub zdolność kredytową - w wysokości nie mnie… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| KOLSAM Sp. z o.o. | 11 | 2024–2026 |
| BBF Sp. z o.o. | 11 | 2015–2025 |
| PORR S.A. | 10 | 2021–2025 |
| Orange Polska S.A. | 10 | 2025 |
| Tabor Dębica Sp. z o.o. | 9 | 2015–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.