Bydgoska Grupa Zakupowa. Supply of electrical energy for the period from 01.01.2027 to 31.12.2027
Bydgoska Grupa Zakupowa. Dostawa energii elektrycznej w okresie od 01.01.2027r. do 31.12.2027r.
Poland · Bydgoszcz · how to bid here →
Your path to submission
- Deadline: 27 October at 10:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL, POL, POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (10 awards, most recently June 2026) — by that rhythm the next award was due around September 2026. The last award went to ENEA SPÓŁKA AKCYJNA.n = 10
- 50% of this buyer's awards went to companies that had already won here before (968 awards since 2015, spread over 388 companies). That is well above the sector norm (35%) — newcomers have a harder time here than elsewhere.n = 968 awards since 2015
- The award came in at a median 77% of the estimated value (40 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 92%.n = 40
- 91% of the bids received came from small and medium-sized enterprises (8 procedures with a bid mix). Sector: 64%.n = 8
- The median procedure drew 3 bids (173 procedures with a bid count); 28% ended with a single bidder. Sector: median 3 bids.n = 173
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,672 recorded awards) — mostly from Spain, Germany, France.
Submission language: POL.
Typical field: median 3 (from 9 awards).
What the buyer is looking for
1. The contracting authorities described in Chapter I of the FTZ jointly conduct a public procurement procedure (Article 38 of the Public Procurement Act). The contracting authority authorised to carry out the procedure and to select the most advantageous tender (part 1, part 2 and part 3 of the contract) is the City of Bydgoszcz. 2. Data on the amount of electricity to be purchased are indicative. The amount of electricity was estimated on the basis of historical data on electricity consumption over a period of 12 months, taking into account the planned changes in use and the actions taken by contracting authorities referred to in Article 37 of the Act of 7 October 2022 on special solutions for the protection of electricity consumers in 2023 and 2024 in connection with the situation on the electricity market and the estimated amount of electricity generated in generating installations.…
Show full description
… The contractor must take into account possible fluctuations in electricity consumption. Reducing or increasing the amount of electricity does not entail any consequences for the contracting authorities (consumers) other than the need to pay for the amount of energy actually consumed. The estimated amount of energy indicated is the amount that the contracting authorities intend to purchase after taking into account the amount of electricity produced on their own and consumed as part of self-consumption. 3. 1) The subject of the contract are the supply of electricity with specified, in accordance with applicable regulations, quality standards. 2) The quality standards for electricity are described in Act Pe and in the Regulation of the Minister for Climate and the Environment of 22 March 2023 on the detailed conditions for the operation of the electricity system (Journal of Laws 2023, No. U 2025 poz. 919 as amended). 3) The rules for shaping and calculating tariffs and settlements in electricity trade are laid down in the Regulation of the Minister of Energy on the method of shaping and calculating tariffs and the method of settlements in electricity trade (Journal of Laws No. U. 2026. 1182). 4. The Contracting Authority does not provide for the award of contracts referred to in Art. 1 point 8 of the PPL Act. 5. Before selecting the most advantageous tender, the contracting authority shall invite the contractor whose tender was the highest rated to submit within a specified period, which shall not be less than 10 days, valid on the date of submission of subjective evidence as described in points 8 to 11 of Chapter VII of the FTZ, subject to the following proviso: 1) The contractor may confirm compliance with the conditions for participation in the procedure by means of a certificate of the contractor for public procurement, if the scope of certification includes the conditions for participation specified by the contracting authority in this procedure. If the certificate covers only part of the conditions for participation in the procedure, the contractor must demonstrate compliance with the other conditions in the manner specified in the FTZ (points 8 et seq.). 2) The contractor may confirm the absence of grounds for exclusion by presenting a valid certificate of the contractor for public procurement covering the circumstances of non-exclusion. 3) If the contractor holds a valid certificate of the contractor of the public contract, the contracting authority will consider it as a personal means of proof in terms of the information covered by the certification. In the scope covered by the certificate, the contracting authority will not require the submission of separate subjective means of proof confirming the absence of grounds for exclusion (to the extent indicated in Article 3(2)(1) of the Certification Act), provided that the certificate covers the required circumstances. If the certificate does not cover all the required circumstances, the contracting authority may request documents only to the extent not covered by the certificate. 4) If the contractor intends to use the Contractor's public procurement certificate, the information about the certificate should be indicated in SEDZ Part II of Section A, in the field concerning entry in the official list of approved Contractors or possession of an equivalent certificate. W
What you must prove — eligibility criteria
1. Wykonawca spełni warunek udziału w postępowaniu dotyczący uprawnień do prowadzenia działalności gospodarczej, jeżeli wykaże posiadanie uprawnień w zakresie obrotu energią elektryczną, tj. posiadanie ważnej Koncesji w zakresie obrotu energią elektryczną wyda… ▸▾
1. Wykonawca spełni warunek udziału w postępowaniu dotyczący zdolności technicznej lub zawodowej, jeżeli wykaże, że wykonał należycie, w okresie ostatnich 3 lat, a jeżeli okres prowadzenia działalności jest krótszy to w tym okresie: 1) W przypadku składania of… ▸▾
cd 6. Wykonawca może w celu potwierdzenia spełniania warunków udziału w postępowaniu, w stosownych sytuacjach oraz w odniesieniu do konkretnego zamówienia, lub jego części, polegać na zdolnościach technicznych lub zawodowych podmiotów udostępniających zasoby, … ▸▾
1. Wykonawca spełni warunek udziału w postępowaniu dotyczący uprawnień do prowadzenia działalności gospodarczej, jeżeli wykaże posiadanie uprawnień w zakresie obrotu energią elektryczną, tj. posiadanie ważnej Koncesji w zakresie obrotu energią elektryczną wyda… ▸▾
1. Wykonawca spełni warunek udziału w postępowaniu dotyczący zdolności technicznej lub zawodowej, jeżeli wykaże, że wykonał należycie, w okresie ostatnich 3 lat, a jeżeli okres prowadzenia działalności jest krótszy to w tym okresie: 1) W przypadku składania of… ▸▾
cd 6. Wykonawca może w celu potwierdzenia spełniania warunków udziału w postępowaniu, w stosownych sytuacjach oraz w odniesieniu do konkretnego zamówienia, lub jego części, polegać na zdolnościach technicznych lub zawodowych podmiotów udostępniających zasoby, … ▸▾
1. Wykonawca spełni warunek udziału w postępowaniu dotyczący uprawnień do prowadzenia działalności gospodarczej, jeżeli wykaże posiadanie uprawnień w zakresie obrotu energią elektryczną, tj. posiadanie ważnej Koncesji w zakresie obrotu energią elektryczną wyda… ▸▾
1. Wykonawca spełni warunek udziału w postępowaniu dotyczący zdolności technicznej lub zawodowej, jeżeli wykaże, że wykonał należycie, w okresie ostatnich 3 lat, a jeżeli okres prowadzenia działalności jest krótszy to w tym okresie: 1) W przypadku składania of… ▸▾
cd 6. Wykonawca może w celu potwierdzenia spełniania warunków udziału w postępowaniu, w stosownych sytuacjach oraz w odniesieniu do konkretnego zamówienia, lub jego części, polegać na zdolnościach technicznych lub zawodowych podmiotów udostępniających zasoby, … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| FIRMA "CZERLI" Lidia Czerwińska | 31 | 2021–2026 |
| BIURO USŁUG TECHNICZNYCH I WYCEN NIERUCHOMOŚCI Barbara Szylman | 29 | 2021–2026 |
| Biuro Nieruchomości ,,LOKATA" Barbara Karczmarczyk | 29 | 2021–2026 |
| Firma FENSTER Sp. z o.o. | 21 | 2021–2026 |
| FIRMA "CZERLI" LIDIA CZERWIŃSKA | 21 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.