Supervision for the design and execution of works on railway line No. 68 on the section Stalowa Wola Rozwadów – Przeworsk together with the provision of design supervision within the project entitled: Works on railway line No. 68 on the section Stalowa Wola Rozwadów – Przeworsk - stage I
Pełnienie nadzoru dla zaprojektowania i wykonania robót na linii kolejowej nr 68 na odcinku Stalowa Wola Rozwadów – Przeworsk wraz z pełnieniem nadzoru autorskiego w ramach projektu pn.: Prace na linii kolejowej nr 68 na odcinku Stalowa Wola Rozwadów – Przeworsk - etap I
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 14 October at 10:00 — 7 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (146 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Transprojekt Gdański Sp. z o.o..n = 146
- 18% of this buyer's awards went to companies that had already won here before (1,657 awards since 2015, spread over 551 companies). That is well below the sector norm (34%) — this buyer switches suppliers more often than others.n = 1,657 awards since 2015
- 18% of the bids received came from other countries (145 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 145
- 15% of awards went to companies from abroad (1,657 awards with a known winner country). Sector average: 1%.n = 1,657
- 52% of the bids received came from small and medium-sized enterprises (145 procedures with a bid mix). Sector: 84%.n = 145
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 05/10/2026.
Foreign bidders
In Poland · Architecture & engineering, 112 contracts went to foreign companies over the last 3 years (of 40,057 recorded awards) — mostly from Germany, France, Switzerland.
Submission language: POL.
Typical field: median 6 (from 80 awards).
What the buyer is looking for
[1] The subject of the contract is the supervision for the design and execution of works on railway line No 68 on the section Stalowa Wola Rozwadów - Przeworsk together with the author's supervision under the project entitled: Works on railway line No 68 on the section Stalowa Wola Rozwadów – Przeworsk – stage I. The scope of the contract also includes the scope of works covered by the Term Option Law referred to in § 7a of the Agreement, to the extent that the Contracting Authority will exercise the Term Option Law. [2] A detailed description of the subject-matter of the contract is to be found in Volume III of the FTZ (‘the FTZ’). [3] Website on which changes and explanations of the content of the FTZ and other Procurement Documents directly related to the Procurement Procedure will be made available: https://platformazakupowa.plk-sa.pl in the sub-establishment dedicated to the present…
Show full description
… Proceedings No 9090/IREZA3/02673/02728/26/P, available in the ‘Current’, ‘Ongoing’ or ‘Resolved’ tab (depending on the stage of the Proceedings).
What you must prove — eligibility criteria
[1] W zakresie warunku określonego w punkcie 8.2.2. IDW wymagane jest wykazanie przez Wykonawcę wykonania, w okresie ostatnich 10 lat przed upływem terminu składania ofert (a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie), co najmniej 1 (j… ▸▾
[1] W zakresie warunku określonego w punkcie 8.2.2. IDW wymagane jest wykazanie przez Wykonawcę dysponowaniem osobami wchodzącymi w skład Zespołu stałego Inżyniera, zgodnie z poniższym wyszczególnieniem: [1.1] Inżynier Projektu: - wykształcenie wyższe; - upraw… ▸▾
[1] W zakresie warunku określonego w pkt 8.2.1. IDW, wymagane jest wykazanie przez Wykonawcę, iż znajduje się w sytuacji ekonomicznej lub finansowej zapewniającej wykonanie Zamówienia, tj.: posiada środki finansowe lub zdolność kredytową - w wysokości nie mnie… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| KOLSAM Sp. z o.o. | 11 | 2024–2026 |
| BBF Sp. z o.o. | 11 | 2015–2025 |
| PORR S.A. | 10 | 2021–2025 |
| Orange Polska S.A. | 10 | 2025 |
| Tabor Dębica Sp. z o.o. | 9 | 2015–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.