Expansion of the 220/110 kV Recław substation for connection of new facilities to the power grid
Rozbudowa stacji 220/110 kV Recław dla przyłączenia nowych obiektów do KSE
Poland · Konstancin – Jeziorna · how to bid here →
Your path to submission
- Deadline: 9 October at 12:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (84 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to Aldesa Construcciones Polska Sp. z o. o..n = 84
- 23% of this buyer's awards went to companies that had already won here before (382 awards since 2015, spread over 146 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 382 awards since 2015
- The award came in at a median 100% of the estimated value (11 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 11
- 53% of the bids received came from small and medium-sized enterprises (57 procedures with a bid mix). Sector: 84%.n = 57
- The median procedure drew 4 bids (323 procedures with a bid count); 11% ended with a single bidder. Sector: median 5 bids.n = 323
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 9 (from 82 awards).
What the buyer is looking for
1. The subject of the Order is the expansion of the 220/110 kV Recław station for the connection of new facilities to the PPS, i.e. the performance of all activities, including design, formal and legal works and construction works (including the purchase and delivery of Equipment and Materials), necessary for the construction of the field in the SE REC and the construction of the Rail Bridge with a dedicated security building and an element not directly related to the construction of the bridge, which is direct entry to the station. The construction of the Rail Bridge should be carried out in accordance with the Guidelines for Rail Bridges (Annex No 3 to Part II of the SWZ - Functional and Utility Programme (hereinafter referred to as PFU) . The Contractor will be responsible for the preparation of complete construction documentation, executive documentation and obtaining a Building…
Show full description
… Permit, Permit for Use, execution of Works, leading to faultless receipt and preparation of as-built documentation. 2. A detailed description of the subject-matter of the contract can be found in Part II of the Functional and Utility Programme. 3. As part of the Order, the Ordering Party provides for the possibility of exercising option rights. 4. Common Procurement Vocabulary names and codes: 45100000-8, 45200000-9, 45300000-0, 45400000-1, 45500000-2, 71200000-0, 71300000-1, 71400000-2, 71500000-3 5. Each time, in all cases, in which the Ordering Party describing the subject of the Order by reference to standards, technical assessments, technical specifications and technical reference systems referred to in Art. 1 point 2 and paragraph. 3 of the Act, the Ordering Party allows solutions equivalent to those described, if they allow to obtain features or parameters not worse than those referred to. This means that the Contractor may apply the solutions described by the Contracting Authority ‘or equivalent’. 6. The Contractor who relies on solutions equivalent to those described by the Ordering Party is obliged to demonstrate that the supplies, services or works offered by him meet the requirements specified by the Ordering Party. The condition for the use of equivalent solutions is written approval by the Employer. Differences between the standards referred to and their equivalents must be described in detail by the Contractor and submitted to the Ordering Party during the performance of the Order – for approval. 7. The Contracting Authority informs that the local vision is mandatory for Contractors. Before submitting a tender, the Contractor must inspect the place where the works that are the subject of the submitted tender will be carried out and familiarize himself with the conditions for the performance of the contract and the difficulties encountered. Proposals for the date of inspection of the object should be sent to the following e-mail address: [email protected]. Deadline for carrying out the vision: the first deadline is 27.08.2026; the second deadline is 21.09.2026. Entrance to the facility in order to carry out an on-site inspection requires notification of the participants of the inspection by completing, respectively, Annexes 1, 2, 3 to the Instructions for granting and supervising access permits and controlling the movement of materials and vehicles at PSE S.A. power stations and submitting them via the Procurement Platform (the ‘questions/information’ tab), at the latest 5 working days before the agreed date of the inspection. Location of the on-site visit: SE RECŁAW is located in the town of RECŁAW. In the case of Contractors jointly applying for the contract in question, the presence of one of them is sufficient. In accordance with Art. 1 point 18) of the Act, the Employer will reject an offer that was submitted without a local inspection or without checking the documents necessary for the performance of the contract available on the spot with the Employer, if the Employer required it in the procurement documents.
What you must prove — eligibility criteria
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… ▸▾
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… ▸▾
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… ▸▾
Ze względu na ograniczoną liczbę znaków w Ogłoszeniu o zamówieniu, Zamawiający informuje, że pełna treść warunków udziału w postępowaniu została wskazana w Rozdz. VII Części I SWZ. 1. O udzielenie zamówienia mogą ubiegać się Wykonawcy, którzy spełniają warunki… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Siemens Energy Sp. z o.o. | 8 | 2023–2025 |
| Przedsiębiorstwo Badawczo-Wdrożeniowe OLMEX S.A. | 7 | 2024–2026 |
| Electrotecnica Arteche Hermanos S.L. | 7 | 2024–2025 |
| ELFEKO S.A. | 7 | 2025–2026 |
| Alterga S.A. | 7 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.