Supply of electricity to the Contracting Authority's facilities and organizational units of Andrespol Municipality
Dostawa energii elektrycznej do obiektów Zamawiającego oraz jednostek organizacyjnych Gminy Andrespol
Poland · Andrespol · how to bid here →
Your path to submission
- Deadline: 30 October at 11:00 — 26 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (3 awards, most recently November 2025) — by that rhythm the next award was due around March 2026. The last award went to Respect Energy S.A..n = 3
- 24% of this buyer's awards went to companies that had already won here before (139 awards since 2015, spread over 100 companies). 76% went to new names.n = 139 awards since 2015
- The median procedure drew 4 bids (10 procedures with a bid count); 10% ended with a single bidder. Sector: median 3 bids.n = 10
- Across 3 procedures with structured selection criteria, this buyer most often required: Equipment, plant and technical facilities (2 of 3), Staff qualifications (2 of 3), References: services (1 of 3), References: works (1 of 3).n = 3
- 1% of awards went to companies from abroad (139 awards with a known winner country). Sector average: 1%.n = 139
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,651 recorded awards) — mostly from Spain, Germany, France.
Submission language: POL.
Typical field: median 3 (from 4,384 awards).
What the buyer is looking for
1. The subject of this contract is the supply of electricity to the premises of the Contracting Authority – the Municipality of Andrespol and the organisational units of the Municipality of Andrespol indicated in Annex No 10 to the FTZ, in the period from 01.01.2027 to 31.12.2027 in accordance with the provisions of the Energy Law Act of 10 April 1997, the Civil Code and implementing acts issued on the basis thereof. 2. The contracting authority acts on its own behalf and is entitled to conduct a public procurement procedure on behalf of the organisational units of the Municipality of Andrespol. 3. The Municipality of Andrespol and the organisational units will conclude separate contracts resulting from this public procurement procedure for the supply of electricity to the contracting authority’s premises and the organisational units of the Municipality of Andrespol. 4. A detailed…
Show full description
… description of the subject of the contract is included in Annex No. 10 to the FTZ entitled: ‘Description of the subject-matter of the contract’, which forms an integral part of this FTZ. 5. The estimated demand for electricity for facilities in the period from 01.01.2027 to 31.12.2027 amounts to a total of 1 987 594 kWh. 6. The Contracting Authority declares that: 1) The procedure for selecting an electricity supplier in the form of a tender is carried out once again. 2) He concluded an agreement for the sale of electricity with Respect Energy S.A., ul. Bonifraterska 17, 00-203 Warszawa – the contract is concluded for a fixed period, until 31.12.2026 and does not require notice of termination. 3) He concluded an agreement for the provision of electricity distribution services with the Distribution Network Operator - PGE Dystrybucja SA for an indefinite period. 4) The forecast of energy consumption indicated above and in the description of the subject of the contract is only an approximate value, which may change during the performance of the contract. Actual energy consumption (smaller or greater than the forecast indicated in Annex 10 to the FTZ) will depend only on the actual needs of the Ordering Party, and the Seller is obliged in each case to apply the energy prices offered in the tender. 5) Up to 14 PPE are connected photovoltaic micro-installations, the production of which is consumed for own needs, and the Contractor selected in the procedure will provide for these PPE the service of receiving energy fed into the DSO's network from micro-installations on the basis of separate contracts concluded in accordance with the model used by the Contractor. 6) To the Contractor selected in the proceedings, the Ordering Party will provide data on EPP in electronic form (MS Excel file). 7) The Ordering Party agrees to conclude the contract by correspondence. 7. The estimated demand for electricity is only indicative, used to compare offers and in any case does not constitute an obligation on the part of the Contracting Authority to purchase energy in the given quantity. 8. The Contractor may not claim any financial claims from the Ordering Party (e.g. compensation) if, during the term of the contract, the Ordering Party purchases from the Contractor less or more electricity than the forecasted amount indicated in the description of the subject of the contract - Annex 10 to the FTZ. 9. The energy supplier is obliged to have a distribution agreement concluded with the Distribution System Operator (DSO) competent for the Customer's facilities, at the latest on the date of conclusion of the contract regarding the order in question and for a period not shorter than until 31.12.2027. The Contractor undertakes to provide the Ordering Party with quality standards of service in accordance with the binding provisions of the Energy Law. 11. The Contractor will be obliged to act as an entity responsible for commercial balancing for electricity sold under the subject-matter of the contract. 12. The subject of the contract does not include the provision of electricity distribution services, and electricity distribution services will be provided on the basis of separate agreements concluded by the Ordering Party with the relevant Distribution System Operator – the DSO data are contained in Annex 10 to the FTZ. 13. To the best of his knowledge, the Ordering Party
What you must prove — eligibility criteria
Zamawiający uzna warunek za spełniony, jeżeli wykonawca wykaże, że posiada aktualnie obowiązującą koncesję na prowadzenie działalności gospodarczej w zakresie obrotu energią elektryczną, wydaną przez Prezesa Urzędu Regulacji Energetyki, zgodnie z art. 32 ustaw… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| INSTYLE24 Sp. z o.o., | 5 | 2023–2024 |
| "STRADA" ADAM OLCZAK ŁUKASZ PIATEK SPÓŁKA CYWILNA | 5 | 2022–2024 |
| Usługi Handel Transport Anna Chmiel | 4 | 2022–2024 |
| STRADA Łukasz Piątek | 3 | 2025–2026 |
| ŻWIR-MAX FIRMA PRZEMYSŁAW SKUPIŃSKI | 3 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.