PROJECT 2020/145. S.P. N. 565 PEDEMONTANA. CONSTRUCTION OF NEW BRIDGE AT KM 9+400 IN PONTE PRETI LOCALITY ON CHIUSELLA STREAM IN THE MUNICIPALITIES OF BALDISSERO CANAVESE AND STRAMBINELLO.
PROGETTO 2020/145. S.P. N. 565 PEDEMONTANA. COSTRUZIONE NUOVO PONTE ALLA KM 9+400 IN LOCALITA' PONTE PRETI SUL TORRENTE CHIUSELLA NEI COMUNI DI BALDISSERO CANAVESE E STRAMBINELLO.
Italy · TORINO · how to bid here →
Your path to submission
- Deadline: 8 October at 12:00 — 4 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ITA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 8% of this buyer's awards went to companies that had already won here before (53 awards since 2019, spread over 30 companies). That is well below the sector norm (22%) — this buyer switches suppliers more often than others.n = 53 awards since 2019
- The award came in at a median 46% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 80%.n = 6
- The median procedure drew 5 bids (53 procedures with a bid count); 13% ended with a single bidder. Sector: median 7 bids.n = 53
- Not one of the 53 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 53
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Italy · Construction work, 29 contracts went to foreign companies over the last 3 years (of 28,452 recorded awards) — mostly from Germany, France, Luxembourg.
Submission language: ITA.
Typical field: median 13 (from 4 awards).
What the buyer is looking for
DRAFT 2020/145. S.P. No 565 PEDEMONTANA. BUILDING NEW BRIDGE TO KM 9+400 IN LOCATION' BRIDGE PRETI ON THE TORRENT CLOSED IN THE MUNICIPALITIES OF BALDISSERO CANAVESE AND STRAMBINELLO.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Italian.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| NATURCOOP SOC.COOP.SOCIALE ONLUS | 2 | 2026 |
| AUTHENTICA S.P.A. | 2 | 2026 |
| Consorzio San Luca | 2 | 2025 |
| S.E.C.A.P. S.P.A | 2 | 2025 |
| MOTTO MAURIZIO | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.