Renovation of a residential building at 54 Haller Street
Haller utca 54. szám alatti lakóépület felújítása
Hungary · Budapest · how to bid here →
Your path to submission
- Deadline: 19 October at 11:00 — 15 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 17% of this buyer's awards went to companies that had already won here before (13 awards since 2019, spread over 2 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 13 awards since 2019
- The median procedure drew 2 bids (12 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 12
- 8% of awards went to companies from abroad (13 awards with a known winner country). Sector average: 3%.n = 13
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Hungary · Construction work, 2 contracts went to foreign companies over the last 3 years (of 1,299 recorded awards).
Submission language: HUN.
Typical field: median 5 (from 1,307 awards).
What the buyer is looking for
Budapest, Haller utca 54. (Telepy utca 2., hrsz: 37786) plot of land classified as "Excluded residential building, courtyard, farm building", the area of which is: 727 m2. The building was granted a building permit by decision of 20 May 2026, file number BP/ÉTDR-2601/1020-25/2026, which became final on 13 June 2026. The plot is covered by the ‘Budapest, IX. ker. In accordance with the rules laid down in the Self-Government Decree No LN-1/IX-R/38 on the District Building Rules of the Public Benefit Rehabilitation Area (Ferenc körút – Üllői út – Haller utca – Mester utca), it is situated in a residential area with high intensity, typically enclosed rows and enclosed yards. On the neighboring plots there are Fszt+3 and Fszt+5 high level condominiums, all the neighboring buildings are underpinned. Currently the building's cellar+ ground floor + 3 storeys high, its roof is unbuilt.…
Show full description
… Previously, 32 apartments had been built in the building. The whole building has a cellar, except the inner courtyard, which is directly accessible from the gateway. Following the planned expansion, refurbishment and renovation, 36 apartments and 1 building unit with storage function will be constructed in the cellar + ground floor + 5 floors residential building. The inner court wing of the existing Telepy Street tract will be demolished, a new basement floor will be built in its place, with a new staircase core, in which 1 lift equipment will also be placed. On the basement level there is the engineering room supplying the building and the storages belonging to the apartments. On the ground floor, in the outer tract, a larger rentable area was established with direct street connection - currently named as a storage room in the plans - as well as the communal space opening from the new condominium lobby, and in the inner tract, two accessible apartments will also be located with inner court connection. In the ground floor courtyard mass with green roof behind the new main staircase there is a bicycle storage and a barrier-free storage. The apartment design of the first three floors is exactly the same, there are 8 flats per floor, on the new fourth floor we have created 6 two-room flats with a retracted street terrace behind the coronation ledge, and on the top new attic level we have created 4 two-room flats facing the courtyard. In the current state of the protected façade, the sectional-decorating elements that were demolished due to conservation and life protection reasons remained in poor condition. The reconstruction of the original structure must be carried out under the supervision of a specialist in the field of architectural history. All doors and windows will be demolished, with regard to the main facade doors and windows, based on the existing one, we will replace them with a new wooden beam case design, walnut stained, and on the inner courtyard facade we will design 3-layer doors and windows with a modern thermal insulation system. The current layout of the unsorted windows on the ground floor street will be discontinued and uniform window windows will be made. Under the existing main walls of the building a brick strip base was made. Due to the necessary interventions, the foundation receives an additional load, therefore soil reinforcement should be used. On the under-cellared parts of the building a new reinforced concrete flooring is made, and on the courtyard part a new strip base is planned to support the pillars of the new terraces. A new reinforced concrete base plate is made for the Lift shaft. The building's load-bearing walls are made of large bricks, typically 45-60cm wide. Due to the design of the new openings, a new vb. pillar structure and filling masonry will be built on the courtyard facade. New openings in the intervening main wall are made by the installation of new steel triggers. Existing partitions are typically dismantled. Walls within new dwellings and separating dwellings based on application technical guides designed with lightweight gk. walls appropriate to the function of the premises. In the case of partition walls, it has a double frame structure (e.g.: the Rigips - Habito System
What you must prove — eligibility criteria
Ajánlattevőnek (közös ajánlattevőnek) - valamint adott esetben a kapacitásait rendelkezésre bocsátó szervezetnek - az ajánlatban a Kbt. 67. § (1)-(2) bekezdése, valamint a közbeszerzési eljárásokban a 321/2015. (X. 30.) Korm. rendelet II. Fejezetének megfelelő… ▸▾
SZ.1.) Alkalmatlan az ajánlattevő, ha az építőipari kivitelezési tevékenységet végző gazdasági szereplő a 191/2009. (IX. 15.) Korm. rendelet 12. §-a szerinti, az építőipari kivitelezési tevékenységet végzők illetékes országos szakmai kamarájának névjegyzékében… ▸▾
P1. Alkalmatlan az ajánlattevő a szerződés teljesítésére, amennyiben az eljárást megindító felhívás feladását megelőző három, mérlegfordulónappal lezárt üzleti év teljes – általános forgalmi adó nélkül számított - árbevétele nem éri el legalább az évi 500 mill… ▸▾
P2. Alkalmatlan az ajánlattevő a szerződés teljesítésére, amennyiben saját vagy jogelődje üzemi vagy üzleti tevékenység eredménye a beszámolója alapján az ajánlati felhívás feladása napját megelőző utolsó három mérlegfordulónappal lezárt üzleti évben egynél tö… ▸▾
M2.1. Alkalmatlan az ajánlattevő a szerződés teljesítésére, ha nem rendelkezik legalább 1 fő a 266/2013. (VII. 11.) Korm. rendelet 1. melléklet VI. Szakma 1. rész 2. pontja szerinti "MV-É" (Építési szakterület) kategóriájú felelős műszaki vezetői jogosultságga… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Garden Fasorfenntartó Kertészeti Szolgáltató Kft. | 2 | 2024–2025 |
| Garden Kertészeti és Erdészeti Szolgáltató Korlátolt Felelősségű Társaság | 2 | 2024–2025 |