Kazán- és fűtéskarbantartási feladatok BGE
Hungary · Budapest · how to bid here →
Your path to submission
- Deadline: 19 October at 12:00 — 16 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: HUN.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 8% of this buyer's awards went to companies that had already won here before (13 awards since 2023, spread over 12 companies). That is well below the sector norm (46%) — this buyer switches suppliers more often than others.n = 13 awards since 2023
- The median procedure drew 5 bids (13 procedures with a bid count); 23% ended with a single bidder. Sector: median 2 bids.n = 13
- 95% of the bids received came from small and medium-sized enterprises (13 procedures with a bid mix). Sector: 80%.n = 13
- Across 3 procedures with structured selection criteria, this buyer most often required: References: supplies (2 of 3), References: services (1 of 3), Technical staff for execution (1 of 3), Minimum turnover in the contract field (1 of 3).n = 3
- Not one of the 13 awards with a known winner country has gone to a foreign company so far. Sector average: 2%.n = 13
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Hungary · Repair & maintenance, 12 contracts went to foreign companies over the last 3 years (of 1,228 recorded awards).
Submission language: HUN.
Typical field: median 2 (from 1,229 awards).
What the buyer is looking for
Envelope amount: The contract is concluded up to a net amount of HUF 80,000,000 + VAT. The Customer undertakes to provide an order up to at least 70% of the total amount. Operational, procedural and warranty requirements A) Operational and repair procedures • Operational visits: On weekdays, 3 times a week (Monday, Wednesday, Friday) between 7:00 and 9:00 (in the field of education before 7:30). • Ordering ad hoc tasks: It is made on the basis of an ad hoc written order issued by the Customer. The Contractor shall provide written professional information and an estimate of working time. • Personal conditions: The work shall be carried out only by qualified personnel. Specifically, refrigeration/climate gas installation may only be carried out by a fitter holding an HR (Category H-I) or equivalent certificate of qualification in accordance with the relevant legislation. • Cleaning and…
Show full description
… workspace: The Contractor shall ensure that the areas adjacent to the work area are cleaned and cleaned up after daily work (in the absence of which the Customer may have it cleaned at the Contractor's expense). B) Deadlines for response, assessment and repair • Havaria in case of error: o Response / on-site appearance: Within 2 hours. o Temporary troubleshooting: Within 4 hours. o Final troubleshooting: Within 2 working days. • For other (normal) errors: o On-the-spot assessment and bidding: Within 2 working days. o Make a correction: Within 15 working days of ordering. Comfort requirements (based on MSZ CR 1752:2000) Interior parameters required during operation (at least category B required): • Auditoriums, classrooms, offices: o In winter: 22,0 ± 1,0 °C (A) / ± 2,0 °C (B) / ± 3,0 °C (C). 24,5 ± 0,5-1,0 °C (A) / ± 1,5 °C (B) / ± 2,5 °C (C). 0,15-0,21 m/s; Sound pressure level: 30 to 40 dB(A). • Walkers, sanitary blocks: In winter, 18.0 ± 2.0 °C, air velocity 0.5 m/s, sound pressure up to 50 dB(A). • Server premises: 22,0 ± 2,0 °C in winter and 24,5 ± 1,5 °C in summer. Technical and system technical characteristics per site • Berzsenyi Campus: FÉG-Vestale boiler group, steel pipe network, plate radiators and NGBS surface heating. • Gyula Lengyel College: Attic 2 pcs Viessmann boiler, distributor-collector, sheet and cast iron radiators. • Buzogány street complex: New (2024) 8 x 150 kW = 1200 kW Gassero Walcon Xtreme condensing boiler plant, pressure equipment, twin column water softener, >600 radiators, 81 fan-coils, air handlers, HMV storages. • Owl Castle College and Unizone: Gassero boilers, heat pumps, VRF and air conditioning systems, radiator, underfloor heating and comfort air handling circuits. • Markó Street building: Attic 2 pcs Buderus Logano GE 615 boiler, cast iron/lap radiators, underfloor heating in the hall, fan coils. • Constitutional street building: Attic 2 pcs Remeha Gas 610 Eco (1062 kW) condensing boiler, 1000 l HMV storage, radiators, underfloor heating, fan-coils. Minimum requirements for regular maintenance: Equipment---Main tasks---Work regularity DOCX Boilers---Annual/Annual Pumps---Decoration, damage/wear testing, direction of rotation, noises, lubrication, test run.---Annual/Half-yearly Gas burners---Flower head and nozzle cleaning, compactness test, flame guard, flame composition and performance measurement, adjustment.---Annual/Annual Pumps-----Decoration, damage/wear testing, direction of rotation, noises, lubrication, test run.-----Yearly 4 times/Half-year Capule curtains--------Filters cleaning, electrical connections, fans, venting.--Filters: operationally dependent; Other: Yearly Fan-coils----Cleaning/replacement of filters, cleaning of drip trays and condensing pipes, disinfection, venting.---Half-yearly Description of heated base areas: ⦁ ‘A-B-C-D-Tlateral’ educational buildings: 11964,19 m2 ⦁ Owl Castle dormitory: 6848,28 m2 ⦁ Unizone building: 3195,11 m2 ⦁ administrative building E: 1699 m2 ⦁ Berzsenyi Campus: 1414.50 m2 ⦁ Constitutional Street Education Building: 8491,59 m2 ⦁ Markó Street Education é
What you must prove — eligibility criteria
A kiválasztási szempontok felsorolása és rövid ismertetése: P1) A Kr. 19. § (1) bek. c) pontja alapján ajánlattevő csatolja az eljárást megindító felhívás feladásának napját megelőző három, mérlegfordulónappal lezárt üzleti évre vonatkozó a közbeszerzés tárgyá… ▸▾
A kiválasztási szempontok felsorolása és rövid ismertetése: M1) A 321/2015. (X.30.) Korm. rend. (Kr.) 1 .§ (1) bek. alapján az AT-nek az ajánlatában a Kbt. II. Része szerint megindított jelen eljárásban az ajánlatának benyújtásakor a közbeszerzési dokumentumok… ▸▾
A kiválasztási szempontok felsorolása és rövid ismertetése: M2) A 321/2015. (X.30.) Korm. rend. (Kr.) 1 .§ (1) bek. alapján az AT-nek az ajánlatában a Kbt. II. Része szerint megindított jelen eljárásban az ajánlatának benyújtásakor a közbeszerzési dokumentumok… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Euro-Profil Rendszerház Kft. | 2 | 2026 |
| Materiál 04 Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság | 1 | 2025 |
| Ferencz-ker Szolgáltató Korlátolt Felelősségű Társaság | 1 | 2026 |
| SimplePay Zártkörűen Működő Részvénytársaság | 1 | 2025 |
| Freedom-Tech Informatika Kereskedelmi és Szolgáltató Korlátolt Felelősségű Társaság | 1 | 2025 |