DESIGN AND EXECUTION “Autostrada Craiova – Filiasi and Drum Express Filiasi – Targu Jiu – Lot 4”
PROIECTARE SI EXECUTIE “Autostrada Craiova – Filiasi si Drum Expres Filiasi – Targu Jiu – Lotul 4”
Romania · Bucuresti · how to bid here →
Your path to submission
- Deadline: 12 October at 15:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (982 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to TRIPOL SISTEM CONSTRUCT.n = 982
- The median procedure drew 3 bids (3,037 procedures with a bid count); 21% ended with a single bidder. Sector: median 5 bids.n = 3,037
- 56% of this buyer's awards went to companies that had already won here before (4,145 awards since 2018, spread over 652 companies). 44% went to new names.n = 4,145 awards since 2018
- The award came in at a median 92% of the estimated value (66 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 66
- 84% of the bids received came from small and medium-sized enterprises (1,913 procedures with a bid mix). Sector: 65%.n = 1,913
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 06/10/2026.
Foreign bidders
In Romania · Construction work, 165 contracts went to foreign companies over the last 3 years (of 78,814 recorded awards) — mostly from France, Italy, Germany.
Submission language: RON.
Typical field: median 4 (from 804 awards).
What the buyer is looking for
The object of the contract is the design and execution of Lot 4 of the investment objective ‘Railway Craiova – Filiasi and Drum Expres Filiasi – Targu Jiu’, with a length of approximately 22.925 km, of which 5.103 km on the profile of the Highway and 17.822 km on the profile of Drum Expres, in accordance with the provisions of the works contract. In accordance with Article 160(1) of Law No 98/2016, as amended, the deadline by which any economic operator interested in participating in the public procurement procedure has the right to request clarifications or additional information in relation to the tender documentation is 25 days before the deadline for the submission of tenders. In accordance with Article 160(2) of Law No 98/2016, as amended, the Contracting Authority shall set a single deadline within which it will respond to all requests for clarification/additional information, as…
Show full description
… follows: 12 days before the deadline for submission of tenders. The deadline for replying to the clarifications was set in such a way that economic operators would have an appropriate period for analysing the tender documentation and, subsequently, for drawing up the tenders in the light of the replies provided by the Contracting Authority.
What you must prove — eligibility criteria
Ofertantul trebuie sa demonstreze ca cifra de afaceri anuala totala a fost de minim 550.000.000 Lei in fiecare dintre exercitiile financiare aferente anilor 2021, 2022 si 2023. Nota 1: Daca un grup de operatori economici depune o oferta comuna, cerinta se demo… ▸▾
Cerinta 2: Ofertantul trebuie sa demonstreze ca a dus la bun sfarsit* in ultimii 5 ani** lucrari de constructie noua si/ sau modernizare si/ sau largire de drumuri nationale si/sau drumuri expres si/sau autostrăzi, la nivelul a maxim 3 contracte, in valoare to… ▸▾
Cerinta 1: Ofertantul trebuie sa demonstreze ca a dus la bun sfarsit* in ultimii 5 ani** servicii de elaborare si/ sau actualizare si/ sau revizuire de Studii de Fezabilitate si/ sau Proiecte Tehnice si/ sau [Proiecte Tehnice si Detalii de Executie]*** pentru … ▸▾
Cerinta 4: Ofertantul trebuie sa demonstreze ca are la dispozitie/are acces la urmatoarele utilaje, instalatii si echipamente tehnice pentru executia lucrarilor: • Statie de asfalt - 2 buc; • Statie de betoane - 2 buc; • Autobasculante - 71 buc; • Excavatoare … ▸▾
Cerinta 5: Ofertantul va preciza categoriile de servicii/ lucrari din contract pe care intentioneaza sa o/le subcontracteze. In cazul in care Ofertantul va subcontracta o parte din contract, Ofertantul are obligatia de a completa, DUAE- sectiunea "Criteriile d… ▸▾
Cerinta 1: Ofertantul trebuie sa faca dovada implementarii sistemului de management al calitatii conform SR EN ISO 9001 sau echivalent in domeniul in care se incadreaza activitatea principala ce face obiectul contractului. Ofertantul/ Ofertantul asociat va com… ▸▾
Cerinta 2: Ofertantul trebuie sa faca dovada implementarii sistemului de management al mediului conform SR EN ISO 14001 sau echivalent in domeniul in care se incadreaza activitatea principala ce face obiectul contractului. Ofertantul/ Ofertantul asociat va com… ▸▾
Operatorii economici ce depun oferta trebuie sa dovedeasca o forma de inregistrare in conditiile legii din tara de rezidenta, din care sa reiasa ca operatorul economic este legal constituit, ca nu se afla in niciuna din situatiile de anulare a constituirii, pr… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| LOIAL IMPEX | 81 | 2024–2026 |
| OYL COMPANY HOLDING AG S.R.L. | 70 | 2024–2026 |
| VESTA INVESTMENT | 66 | 2024–2026 |
| SC EDIL CONTRACT SRL | 65 | 2024–2026 |
| TRANSPOL SERVICE | 60 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.