Upgrading the pump stations behind the piers of SH. Rm. Vâlcea: ‘SP Topolog de la CHE Babeni, SP Bratia de la CHE Babeni, SP Bistrita de la CHE Babeni, SP Olanu de la CHE Ionești, SP Oltet de la CHE Ipotesti, SP Poganu de la CHE Strejesti, SP Teslui de la CHE Arcesti, SP Teslui – Farcasele de la CHE Drăgănești’
Modernizare statii de pompe din spatele digurilor din cadrul SH. Rm. Vâlcea: „SP Topolog de la CHE Babeni, SP Bratia de la CHE Babeni, SP Bistrita de la CHE Babeni, SP Olanu de la CHE Ionesti, SP Oltet de la CHE Ipotesti, SP Poganu de la CHE Strejesti, SP Teslui de la CHE Arcesti, SP Teslui – Farcasele de la CHE Draganesti”
Romania · Bucuresti · how to bid here →
Your path to submission
- Deadline: 19 October at 15:00 — 15 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: RON.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (18 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to Synergy Construct.n = 18
- 31% of this buyer's awards went to companies that had already won here before (284 awards since 2021, spread over 126 companies). That is well below the sector norm (58%) — this buyer switches suppliers more often than others.n = 284 awards since 2021
- The median procedure drew 2 bids (235 procedures with a bid count); 31% ended with a single bidder. Sector: median 5 bids.n = 235
- 14% of awards went to companies from abroad (284 awards with a known winner country). Sector average: 0%.n = 284
- The award came in at a median 87% of the estimated value (14 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 83%.n = 14
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Romania · Construction work, 161 contracts went to foreign companies over the last 3 years (of 77,851 recorded awards) — mostly from France, Italy, Germany.
Submission language: RON.
Typical field: median 2 (from 18 awards).
What the buyer is looking for
The object of the contract is to carry out the works for ‘Modernisation of pump stations behind dams in the HS. Rm. Valcea: SP Topolog de la CHE Babeni, SP Bratia de la CHE Babeni, SP Bistrita de la CHE Babeni, SP Olanu de la CHE Ionești, SP Oltet de la CHE Ipotesti, SP Poganu de la CHE Strejesti, SP Teslui de la CHE Arcesti, SP Teslui – Farcasele de la CHE Drăgăneşti’, which mainly include: - Constructions related to the modernization of hydromechanical equipment (barbecue, batardou, balustade, etc.) - Constructions related to the modernization of electrical equipment (container foundation, diesel group, cables, etc.) - Electrical installations related to constructions (cabinets, video monitoring system, anti-burglary, etc.) - Hydromechanical installations (electropompa, discharge pipe, etc.). The pumping stations behind the dams, which are part of the investment objective for which the…
Show full description
… purchase is being started, were put into operation around the 1980s, being equipped and built with equipment manufactured according to the technology of the time, and these pumping stations are still in operation today. The pumping stations, behind the dams, have the role of evacuating the waters resulting from the infiltrations from the reservoirs, as well as the rain waters from the surrounding enclosure, at the same time restoring a significant amount of reclaimed water in the hydropower circuit of the facilities within SH Rm Valcea. Also, a particularly important role is played by reducing the risks of flooding of human households and nearby agricultural areas. During the operation of the equipment, in the composition of the pump stations behind the dams, since commissioning until now, there have been reported operational deficiencies, due to the obsolescence and physical wear of the hydraulic, electrical, mechanical and automation equipment, and significant degradation of the construction elements at these pump stations. To all these deficiencies are added the incidents at two of the pumping stations, SP Topolog and SP Bistrița, stations that have been completely flooded as a result of the significant rainfall, which has caused significant damage to both the construction part and the pumping and electrical installations. Taking into account all aspects of the poor technical condition, major interventions are required as part of modernization works on all hydraulic, electrical, mechanical and automation equipment in the pumping stations behind the dams in S.H. Rm. Valcea: SP Topolog, SP Bratia, SP Bistrita, SP Olanu, SP Oltet, SP Poganu, SP Teslui, SP Teslui-Farcasele.
What you must prove — eligibility criteria
Operatorii economici care depun ofertă trebuie să dovedească o formă de înregistrare în condițiile legii din țara rezidentă, din care să reiasă că operatorul economic este legal constituit, că nu se află în niciuna din situațiile de anulare a constituirii, pre… ▸▾
Declarație privind lista principalelor lucrări similare duse la bun sfârșit în ultimii 10 ani. Cerința minimă: Prin sintagma ”duse la bun sfârșit” se înțelege: lucrări recepționate pe obiecte, care sunt însoțite de proces-verbal de recepție întocmit în conform… ▸▾
Ofertantul va face dovada implementării unui sistem de calitate conform ISO 9001 sau echivalent (pentru execuție și proiectare) , cu natura și obiectul contractului. Justificare: privind cerința minimă cu privire la ISO 9001: candidații trebuie să-și demonstre… ▸▾
Ofertantul va face dovada implementării unui sistem de calitate conform ISO 14001 sau echivalent (pentru execuție), cu natura și obiectul contractului. - necesitatea respectării unui sistem de calitate în vederea desfașurării de către candidat a activităților … ▸▾
Cerința nr. 1** Pentru domeniile reglementate, ofertantul (Candidat individual, membru al Asocierii, Subcontractantul nominalizat, pentru partea de contract pe care o realizează efectiv) va face dovada deținerii de Autorizații / Atestări în domeniile reglement… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| ASEE Solutions | 8 | 2024–2026 |
| ORANGE ROMANIA | 8 | 2024–2026 |
| S.C. ORANGE ROMANIA COMMUNICATIONS S.A. | 7 | 2024–2026 |
| S.C. VODAFONE ROMANIA S.A. S.R.L. | 7 | 2024–2026 |
| FOCALITY | 6 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.