Single Party Framework Consultancy for the Development of a Parking Strategy for Limerick
Ireland · Limerick. · how to bid here →
Your path to submission
- Deadline: 9 October at 16:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 24% of this buyer's awards went to companies that had already won here before (289 awards since 2023, spread over 199 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 289 awards since 2023
- The median procedure drew 5 bids (143 procedures with a bid count); 9% ended with a single bidder. Sector: median 3 bids.n = 143
- 9% of awards went to companies from abroad (289 awards with a known winner country). Sector average: 2%.n = 289
- The award came in at a median 100% of the estimated value (33 awards with both estimate and value) — pricing at the estimate is usually about right here.n = 33
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 02/10/2026.
Foreign bidders
In Ireland · Transport support services, 5 contracts went to foreign companies over the last 3 years (of 320 recorded awards).
Submission language: ENG.
Typical field: median 3 (from 255 awards).
What the buyer is looking for
Limerick City Centre is undergoing a holistic change in the way that it manages its commuter traffic. The way in which commuters can use the road network within the city centre is being changed with the introduction of viable alternatives to the traditional car centric philosophies of the past. Enhancements through the introduction of Active travel infrastructure and future plans with respect to LSMATs and Bus connects projects will provide commuters with real viable alternatives when travelling to and from the City centre. The Mayoral program, supported by the Draft Limerick City Centre Transport Plan has the potential to enact further change in the way the city is viewed from a commuter perspective. Limerick City and County Council are aware that the proposed changes will create a number of opportunities and challenges for commuters, with one such challenge being the change to existing…
Show full description
… on street parking. It is the intention of this appointment to develop a parking strategy that will provide Limerick City and County Council a clear philosophy in the management of the existing and projected on street parking in the short, medium and long term as the projects outlined above come to fruition.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in English.
Eligibility analysis from the tender documents
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PUNCH Consulting Engineers | 6 | 2024–2025 |
| Studio PKA Ltd. t/a Paul Keogh Architects | 4 | 2023–2024 |
| MHL and Associates Ltd | 4 | 2024–2026 |
| The GrooveYard | 4 | 2024–2026 |
| A2 Architects | 4 | 2025–2026 |