Przebudowa budynku Collegium Iuridicum z przestrzenią Paramuzeum UAM w przyziemiu

Poland · Poznań · how to bid here →

Your path to submission

  1. Deadline: 16 October at 10:00 — 13 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: POL.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 2 months (179 awards, most recently August 2026) — the next award is due around October 2026 by that rhythm. The last award went to DEMIURG sp.z o.o..n = 179
  • The median procedure drew 2 bids (359 procedures with a bid count); 40% ended with a single bidder. Sector: median 5 bids.n = 359
  • 36% of this buyer's awards went to companies that had already won here before (1,070 awards since 2015, spread over 460 companies). 64% went to new names.n = 1,070 awards since 2015
  • The award came in at a median 103% of the estimated value (10 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 83%.n = 10
  • 6% of awards went to companies from abroad (1,070 awards with a known winner country). Sector average: 0%.n = 1,070

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 30/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 192,928 recorded awards) — mostly from Germany, Spain, France.

Submission language: POL.

Typical field: median 3 (from 3 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The subject of the contract is the reconstruction of the Collegium Iuridicum building with the space of the AMU Paramuseum in the ground floor. A detailed description of the subject-matter of the contract is described in the design documentation, STWiOR, work dimensions, description of the subject-matter of the contract [Annexes No 10]. The contracting authority does not allow the submission of partial tenders. Minimum warranty periods: 1) for construction works and installed materials and equipment, the Contractor grants a guarantee for a minimum period of 36 months from the date of signing the final acceptance protocol by the Parties; Note: The quality guarantee period for the construction works carried out and the materials and equipment installed is a criterion for the evaluation of tenders. 2) warranty for physical and legal defects in materials, equipment, elements of equipment and…

Show full description

… all works, construction works carried out as part of the implementation of the subject of the contract, is granted for a period of 5 years from the date of signing the final acceptance protocol. Pursuant to Article 95 of the Public Procurement Act, the contracting authority requires the contractor, subcontractor or subcontractor to employ persons performing the work covered by the contract on the basis of the employment relationship, in accordance with the draft provisions of the contract annexed to the FTZ – it applies to persons performing: construction works, installation works included in the scope of the contract. This requirement does not apply to activities covered by the subject-matter of this contract falling within the scope of the duties of persons performing functions in accordance with Chapter III. 7.7.2(a) I. SWZ: construction managers, works managers. The contractor may subcontract part of the contract. The Ordering Party allows equivalent solutions described in the FTZ - in accordance with the provisions of Chapter II of the Agreement. 4 point 1. SWZ. The Ordering Party reserves that all materials (products) which may be included in the FTZ or any other document integral with the FTZ are not intended to infringe Article 99 of the Public Procurement Act, but are only intended to clarify the Ordering Party's quality and technological expectations. This should be understood as specifying the required minimum performance, functional and technical parameters or quality standards. In accordance with Art. 4 of the Public Procurement Law Act if the description of the subject of the contract refers to standards, technical assessments, technical specifications and technical reference systems referred to in para. 1 point 2 and paragraph. 3 of the Public Procurement Law, and such references are accompanied by the expression ‘or equivalent’, the Contracting Authority shall allow an equivalent solution as described in each such standard, technical assessment, technical specification and technical reference system. As an equivalent solution, solutions should be understood that guarantee the correct implementation of works and ensure that technical parameters are not inferior to those assumed in the procurement documents, do not lower the standards specified in the documentation and ensure the performance of the contract in accordance with the expectations and requirements of the Ordering Party specified in the FTZ and those that are characterized by parameters / descriptions not inferior to those required and included in the documentation. Where the description of the subject-matter of the contract refers to performance or functional requirements referred to in Art. 1 point 1 Public procurement law, the Contractor may rely on the conformity of the works, supplies or services offered with the performance or functionality requirements specified by the contracting authority with the relevant standards, if these standards, technical assessments, specifications and technical reference systems relate to the performance or functionality requirements specified by the contracting authority. All indications (names/marks/standards, etc.) indicated in the procurement documents shall be accompanied by the words "or equivalent". Therefore, the Ordering Party, as indicated above, in any such case allows the use of materials, equipment, equivalent solutions. The Contractor may, where appropriate, confirm compliance with the conditions for participation in the procedure.

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.

Contract

BuyerUniwersytet im. Adama Mickiewicza w Poznaniu
TypeWorks
Estimated valuevalue not published
Published23 September 2026
CategoryConstruction work · CPV 45000000

Who has won here before

CompanyAwardsPeriod
Przedsiębiorstwo Robót Hydrotechnicznych i Budowlanych HYDROSERVIS mgr inż. Krzysztof Sporny342021–2026
WiMaKS Skwara Sławomir212021–2026
Syriana Joanna Fischer162024–2026
Instytut Chemii Bioorganicznej Polskiej Akademii Nauk, Poznańskie Centrum Superkomputerowo-Sieciowe162021–2026
CLARIFITY Sp. z o.o.152024–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

202119
202224
202313
202438
202537
202636

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Friday 16 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, and he learns from your feedback.
Register now →