Design and execution of works for the task entitled: "Works on the railway line C-E 20 on the section Pilawa - Łuków"
Zaprojektowanie i wykonanie robót dla zadania pn.: "Prace na linii kolejowej C–E 20 na odcinku Pilawa - Łuków"
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 30 October at 10:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (260 awards, most recently September 2026) — the next award is due around October 2026 by that rhythm. The last award went to Pomorskie Przedsiębiorstwo Mechaniczno-Torowe Spółka z ograniczoną odpowiedzialnością.n = 260
- 18% of this buyer's awards went to companies that had already won here before (1,657 awards since 2015, spread over 551 companies). That is well below the sector norm (44%) — this buyer switches suppliers more often than others.n = 1,657 awards since 2015
- The median procedure drew 3 bids (1,218 procedures with a bid count); 31% ended with a single bidder. Sector: median 5 bids.n = 1,218
- 18% of the bids received came from other countries (145 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 145
- 15% of awards went to companies from abroad (1,657 awards with a known winner country). Sector average: 0%.n = 1,657
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 05/10/2026.
Foreign bidders
In Poland · Construction work, 139 contracts went to foreign companies over the last 3 years (of 193,366 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 6 (from 170 awards).
What the buyer is looking for
The subject of the Order is the design and execution of works for the task entitled: ‘Works on the Pilawa – Łuków section of railway line C-E 20’. The entire subject of the Order includes the execution of the following elements: The basic scope of the contract includes: - section from km 98,623 to km 161,160: 1) Implementation of project documentation, including: a) preparation of an executive design, b) preparation of a replacement construction project and obtaining a building permit and other necessary administrative decisions, if necessary, c) preparation of as-built documentation, including geodetic as-built documentation, 2) and works in the scope of: a) track system, trackbed and drainage, b) road system, c) rail traffic control and dSAT equipment, d) overhead contact line, e) overhead contact line supply, f) non-traction power supply, g) telecommunications equipment (including…
Show full description
… CSDIP) with associated infrastructure, h) engineering facilities, i) cubature facilities with installations, j) street furniture and passenger service facilities, k) networks and sanitary installations (water, canal, gas, co), l) telecommunications, m) environmental protection, n) dendrological inventory and felling of trees, o) construction of CSDIP, SSC and SMW equipment, i.e.: - devices and installations of the CSDIP system with power supply, - devices and installations of the SSC system with power supply, - devices and installations of the SMW system with power supply, - devices and installations of the data transmission system for the needs of CSDIP and SMW with integration with the existing teletransmission network of PLK SA. 3) carry out the conformity assessment process of the structural subsystems within the scope of the contract at each stage (design, construction and final testing of the subsystem) and provide the relevant EC declarations of verification and EC certificates of verification for the subsystems. The interface option includes: Execution of cooperation with other contractors performing construction works or supplies for the Employer, and which require a connection with the built-up devices under this task. Cooperation will take place through the Customer and/or the Engineer. The Contracting Authority envisages the following scope of work carried out under other Contracts, which affects the need to make changes in the scope of interfaces (implementation of the Interface Option). The detailed scope of the Interface Option is set out in Chapter 5 of TOMU III – PFU ‘Expected changes to interfaces’, which concern the interlocking devices to be installed under this contract. Detailed Description of the Subject of the Order is presented in the Functional and Utility Program (PFU) constituting Volume III of the SWZ.
What you must prove — eligibility criteria
W zakresie warunku dotyczącego zdolności technicznej lub zawodowej wymagane jest: 1) Wykazanie przez Wykonawcę, że w okresie ostatnich 10 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy – w tym okresie wykonał: a… ▸▾
Dysponowania osobami zdolnymi do wykonania Zamówienia, zgodnie z poniższym wyszczególnieniem: 1) Dyrektor kontraktu - 1 osoba: -posiada co najmniej 5 (pięć) lat doświadczenia zawodowego na stanowisku dyrektora kontraktu lub zastępcy dyrektora kontraktu* lub na… ▸▾
Dostępności do niżej wymienionych narzędzi i urządzeń technicznych w celu realizacji Zamówienia: a.usunięto; b.co najmniej 1 szt. – automatyczna podbijarka toru, o wydajności minimum 600 mb toru / 1 godz. pracy wyposażona w system automatycznej rejestracji par… ▸▾
W zakresie warunku dotyczącego sytuacji ekonomicznej i finansowej wymagane jest: Wykazanie przez Wykonawcę, iż znajduje się w sytuacji ekonomicznej lub finansowej zapewniającej wykonanie Zamówienia, tj.: a) posiada w ciągu ostatnich 3 lat obrotowych, a jeżeli … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| KOLSAM Sp. z o.o. | 11 | 2024–2026 |
| BBF Sp. z o.o. | 11 | 2015–2025 |
| PORR S.A. | 10 | 2021–2025 |
| Orange Polska S.A. | 10 | 2025 |
| Tabor Dębica Sp. z o.o. | 9 | 2015–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.