Friedrich & ClementBETA

Przechowywanie (w 2027 roku) na parkingu strzeżonym pojazdów usuniętych z dróg na podstawie ustawy Prawo o ruchu drogowym

Poland · Bydgoszcz · how to bid here →

Your path to submission

  1. Deadline: 22 October at 10:00 — 18 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: POL.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • In this sector the buyer awards roughly every 10 months (6 awards, most recently September 2026) — the next award is due around July 2027 by that rhythm. The last award went to SILVER WORK PRO Spółka z o.o..n = 6
  • 50% of this buyer's awards went to companies that had already won here before (968 awards since 2015, spread over 388 companies). 50% went to new names.n = 968 awards since 2015
  • The median procedure drew 3 bids (173 procedures with a bid count); 28% ended with a single bidder. Sector: median 2 bids.n = 173
  • The award came in at a median 77% of the estimated value (40 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 40
  • 91% of the bids received came from small and medium-sized enterprises (8 procedures with a bid mix). Sector: 68%.n = 8

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.

Clement
When comparable contracts were last awarded here, usually only 2 offers came in — a solid bid has real chances.
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Poland · Other services, 3 contracts went to foreign companies over the last 3 years (of 4,528 recorded awards).

Submission language: POL.

Typical field: median 2 (from 699 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

I. 1. The subject of the contract is the storage (in 2027) in a guarded car park of vehicles removed from the roads on the basis of the Road Traffic Act. The subject of the contract is included in the annex to the FTZ entitled: ‘Description of the subject-matter of the contract’ 2. The contracting authority provides for the award of contracts referred to in Art. 1 point 7 of the Public Procurement Act Possible similar contracts: 1) will cover the increased scope of work specified in point 1 of the Annex to the contract, 2) the conclusion of the contract will be preceded by an appropriate invitation to negotiations and negotiations 3. The Contracting Authority shall not require the lodging of a security for the proper performance of the contract. II. 1. CERTIFICATES. The subjective means of proof indicated in Chapter X may be replaced by a valid certificate of the public procurement…

Show full description

… contractor referred to in Article 124 para. 2 of the PPL, only to the extent that the certificate confirms the absence of grounds for exclusion or compliance with the conditions for participation in the procedure (if the conditions have been specified in the procedure) to the extent corresponding to the requirements set out in the FTZ. The certificate does not replace subjective means of proof concerning exclusion grounds not covered by the certification, in particular Article 108 para. 1 point 6 of the Public Procurement Act, Article 109 par. 1 point 6 of the Public Procurement Act, Art. 1 of the Act of 13 April 2022 on special arrangements for counteracting support for aggression against Ukraine and for protecting national security, as well as the circumstances arising in the course of the present proceedings. 2. The certificate shall replace subjective means of proof only to the extent covered by a valid certification and indicated by the contractor in the statement referred to in Art. 1 uPzp. If the certificate covers only part of the grounds for exclusion or part of the condition (if the conditions have been specified in the procedure) of participation in the procedure, or confirms compliance with the condition at a level lower than that required in the FTZ, the economic operator shall submit subjective evidence in the remaining scope. 3. To the extent resulting from a valid certificate, the contracting authority shall not require other subjective means of proof from the contractor, subject to Art. 4 of the PPL and Article 31 para. 6 of the Act on the certification of public procurement contractors. 4. Before selecting the most advantageous tender, the Contracting Authority shall invite the Contractor whose tender has been the highest rated to submit, within the prescribed time limit valid on the date of submission of the subjective means of proof indicated in Chapter X, to the extent that they have not been replaced by a valid certificate of the Contractor for public contracts, taking into account the following provisions: 1) If from the preliminary statement referred to in Art. 1 uPzp, it follows that the Contractor will use the certificate, and the Contractor provided data on the certificate enabling the Ordering Party to independently verify the certificate in the certification database, the Ordering Party will not call the Contractor to submit subjective means of evidence to the extent that the circumstances required by the Ordering Party result from this certificate, 2) If the certificate does not cover all the circumstances required by the Ordering Party, the Ordering Party will call the Contractor to submit subjective means of evidence only to the extent not covered by the certification 3) If the data indicated by the Contractor do not allow to find or verify the certificate in the certification database, the Ordering Party may call the Contractor to submit, supplement, correct or clarify these data on the terms set out in Article 128 sec. 1 or 4 UPpp. If, despite the request, the contracting authority will not be able to verify the certificate, the certificate will not be included to the extent that it cannot be verified. 4) If the data necessary for the assessment of the circumstances confirmed by the certificate have not been disclosed in the certificate or in the certification database due to their legally protected nature, the contracting authority may require the contractor to make these data available or agree to make them available to the contracting authority by the certification body, after

Machine translation (EU eTranslation) — official wording via the PDF link.

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.

Contract

BuyerMiasto Bydgoszcz
TypeServices
Estimated valuevalue not published
Published22 September 2026
CategoryOther services · CPV 98351100

Who has won here before

CompanyAwardsPeriod
FIRMA "CZERLI" Lidia Czerwińska312021–2026
BIURO USŁUG TECHNICZNYCH I WYCEN NIERUCHOMOŚCI Barbara Szylman292021–2026
Biuro Nieruchomości ,,LOKATA" Barbara Karczmarczyk292021–2026
Firma FENSTER Sp. z o.o.212021–2026
FIRMA "CZERLI" LIDIA CZERWIŃSKA212021–2026
From 18.0M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20211
20222
20242
20253
20264

Who knows the rhythm prepares instead of reacting.

·
days until the deadline — Thursday 22 October at 10:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full notice — Original + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now →
Przechowywanie (w 2027 roku) na parkingu strzeżonym pojazdów usuniętyc — Friedrich & Clement