B/21/2026 Remont Klubu Studenckiego Skrzat wraz z remontem balkonu
Poland · Opole · how to bid here →
Your path to submission
- Deadline: 22 October at 10:00 — 18 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (59 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Przedsiębiorstwo Budowlane „PROFBUD” Wojtas Spółka Jawna.n = 59
- The median procedure drew 2 bids (207 procedures with a bid count); 36% ended with a single bidder. Sector: median 5 bids.n = 207
- 40% of this buyer's awards went to companies that had already won here before (1,063 awards since 2015, spread over 500 companies). 60% went to new names.n = 1,063 awards since 2015
- 6% of awards went to companies from abroad (1,063 awards with a known winner country). Sector average: 0%.n = 1,063
- 8% of the bids received came from other countries (117 procedures with a bid mix) — all bidders, not just the winners. Sector: 1%.n = 117
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Construction work, 138 contracts went to foreign companies over the last 3 years (of 193,303 recorded awards) — mostly from Germany, Spain, France.
Submission language: POL.
Typical field: median 5 (from 4,943 awards).
What the buyer is looking for
I. The subject of the contract is: Renovation of the Skrzat Student Club along with the renovation of the balcony 1. The description of the subject-matter of the contract is set out in Annex 1.1 to the FTZ and in the technical documentation constituting Annex 1.2 to the FTZ – zip folder. 2. The deadline for completion of the subject of the contract is: seventy-five [75] calendar days from the date of conclusion of the contract. 3. The deadline for performance of the subject-matter of the contract indicated in point 2 is the maximum deadline for performance of the subject-matter of the contract. The contractor may indicate in the tender a shorter period for performance of the subject of the contract, but not less than sixty [60] calendar days from the date of conclusion of the contract. II. Other information 1. The contracting authority does not allow partial tenders to be submitted. 2.…
Show full description
… The contracting authority does not allow variants to be submitted. 3. Pursuant to Article 95 of the Act, the Contracting Authority requires employment by the Contractor or Subcontractor on the basis of an employment relationship (within the meaning of the Labour Code Act of 26 June 1974 (Journal of Laws of 2025, item 277, as amended) persons performing the following activities related to the performance of the contract, the performance of which consists in the performance of work. Type of activities related to the performance of the contract, which are subject to employment requirements on the basis of an employment relationship by the Contractor or Subcontractor of persons performing activities during the performance of the contract: general construction works, electrical works. The method of verification by the Employer of the employment of these persons and the Employer's powers to control compliance by the Contractor with the requirements related to the employment of these persons and penalties for non-compliance with these requirements have been specified by the Employer in the draft contract constituting Annex 3 to the SWZ. 4. The Contracting Authority does not provide for the possibility of awarding the contracts referred to in Article 214(1)(7) and (8) of the Public Procurement Act. 5. Requirements for performance guarantee 5.1. The contracting authority will require the contractor to secure the proper performance of the contract in the amount of 5% of the total price indicated in the tender, which is used to cover claims for non-performance or improper performance of the contract. 5.2. The contractor will propose the form of lodging a security: in money, bank guarantees or guarantees of the cooperative savings and credit union, except that the obligation of the credit union is always a monetary obligation, bank guarantees, insurance guarantees, guarantees granted by entities referred to in Art. 5 point 2 of the Act of 9 November 2000 on the establishment of the Polish Agency for Entrepreneurship. Guarantees must be unconditional. 5.3. The security may be lodged in one or more forms. 5.4. Seventy [70]% of the security will be returned within 30 days from the date of performance of the contract and the ordering party considers that it has been duly performed, and thirty [30]% will be returned 15 days after the expiry of the warranty period for defects or guarantees. 5.5. The security must be lodged at the latest on the date of conclusion of the contract.
What you must prove — eligibility criteria
Warunek zostanie uznany za spełniony, jeżeli Wykonawca dysponuje i skieruje do realizacji zamówienia łącznie: Kierownika robót konstrukcyjno-budowlanych nadzorującego wykonywane u Zamawiającego prace, tj.: osobę, która posiada uprawnienia budowlane w specjalno… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| SIGMA Sp. z o.o. | 27 | 2021–2026 |
| ATABAJT Roik, Słowik, Mazurkiewicz S.J. | 27 | 2020–2026 |
| Przedsiębiorstwo Budowlane „Profbud” Wojtas Spółka Jawna | 20 | 2021–2026 |
| ABE Holding Sp. z o.o. | 15 | 2022–2026 |
| ARKANET Wojciech Oleś, Stanisław Zygor sp.j. | 14 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.