‘The year-round (current and winter) maintenance of the country’s roads in the administration of the GDDKiA Branch in Rzeszów, divided into 4 parts: Part 1 –utrzym. of the country’s roads. The Przemyśl Region – A-4 motorway in the Rzeszów East section (excluding the junction) to Jarosław Zachód with the (hub) Part 2 –utrzym. of the country’s roads. G, GP of the Przemyśl Region – Cz 3 –utrzym. of the country’s roads. G, GP of the Lesku Cz 4 –utrzym. of the country’s roads. G, GP and S of the Nisku Region
„Całoroczne (bieżące i zimowe) utrzymanie dróg kraj. będących w administracji GDDKiA Oddział w Rzeszowie, w podziale na 4 części: Cz 1 –utrzym. dróg kraj. Rejonu w Przemyślu -autostrady A-4 na odc. Rzeszów Wschód (bez węzła) do Jarosław Zachód z (węzłem) Cz 2 –utrzym. dróg kraj. G, GP Rejonu w Przemyślu Cz 3 –utrzym. dróg kraj. G, GP Rejonu w Lesku Cz 4 –utrzym. dróg kraj. G, GP i S Rejonu w Nisku
Poland · Rzeszów · how to bid here →
Your path to submission
- Deadline: 5 October at 11:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL, POL, POL, POL.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 12% of this buyer's awards went to companies that had already won here before (18 awards since 2023, spread over 14 companies). That is well below the sector norm (48%) — this buyer switches suppliers more often than others.n = 18 awards since 2023
- 60% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 92%.n = 5
- The median procedure drew 2 bids (18 procedures with a bid count); 44% ended with a single bidder. Sector: median 3 bids.n = 18
- Across 8 procedures with structured selection criteria, this buyer most often required: Technical staff for quality control (7 of 8), References: services (5 of 8), References: works (3 of 8), Technical staff for execution (1 of 8).n = 8
- Not one of the 18 awards with a known winner country has gone to a foreign company so far. Sector average: 0%.n = 18
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Poland · Cleaning, environment & waste, 40 contracts went to foreign companies over the last 3 years (of 56,736 recorded awards) — mostly from Bulgaria, France, Czechia.
Submission language: POL.
Typical field: median 3 (from 16,509 awards).
What the buyer is looking for
The subject of the contract is: ‘All year (current and winter) maintenance of national roads in the administration of the General Directorate for National Roads and Motorways, Rzeszów Branch, divided into 4 parts: Part 1 – maintenance of the national roads of the District in Przemyśl – A-4 motorway section Rzeszów Wschód (without junction) to Jarosław Zachód with (interchange) Part 2 – maintenance of the national roads G, GP of the District in Przemyśl Part 3 – maintenance of the national roads G, GP of the District in Lesko Part 4 – maintenance of the national roads G, GP and S of the District in Nisko.’ The contracting authority shall allow partial tenders to be submitted in accordance with the division of the subject of the contract specified in point 6.1. IDW SWZ. Pursuant to Art. 1 of the Public Procurement Act, the Employer specifies that one Contractor may submit an offer for a…
Show full description
… maximum of two freely selected parts of the contract. The subject-matter of the contract covers performance for Part 1 in the period from 01.05.2027 to 30.04.2031, and if the contract is signed after 01.05.2027, it will apply from the date of the protocol handover of roads for maintenance until 30.04.2031, for Part 2 in the period from 01.09.2027 to 31.08.2031, and if the contract is signed after 01.09.2027, it will apply from the date of the protocol handover of roads for maintenance until 31.08.2031, for Part 3 in the period from 01.05.2027 to 30.04.2031, and if the contract is signed after 01.05.2027, it will apply from the date of the protocol handover of roads for maintenance until 30.04.2031, for Part 4 in the period from 01.06.2027 to 31.05.2031, and if the contract is signed after 01.05.2027, it will apply from the date of the protocol handover of all roads for the period referred to the maximum duration of the contract until 31.05.2031. 8, may not exceed 48 months from the beginning of the implementation of the contract, all-year-round works, including winter and current road maintenance, in particular: - maintenance of road surfaces and engineering facilities - maintenance of roadsides and separation lanes,- maintenance of the road body,- maintenance of drainage,- maintenance of pavements and bicycle paths,- maintenance of markings,- maintenance of traffic safety devices, - maintenance of the aesthetics of signs, traffic safety elements and the road lane,- maintenance of assistive devices,- winter maintenance of roads,- Contract Management, - maintenance of cleanliness and repair and maintenance works on engineering facilities. In detail, the scope of the subject of the contract required for performance is specified in the Description of the subject of the contract, technical specifications, draft provisions of the contract. The contracting authority provides for the possibility of applying the right of option referred to in Article 441 sec. 1 of the PPL Act. As part of this contract, the Employer provides for the possibility of applying the right of option in the scope of: 1) Execution of works on sections of roads other than those indicated in §1 section 1, located in the area of the District whose roads are subject to maintenance under this Agreement, or in the area of neighbouring Districts forming part of the GDDKiA structure, specified in Annex No. 15 to the Agreement to the extent specified in Annex No. 2 to the Agreement Tables of Settlement Elements for works marked as works to be carried out under the option right. These works will be settled at the prices specified by the Contractor for the basic contract for these works. The above-mentioned prices for roads of the same section and standard of maintenance will be used to calculate the Contractor's remuneration; 2) the possibility of entrusting the Contractor with the performance of works, in the case referred to in § 3 sec. 2 - for a period not exceeding 10 months - within the scope of the basic contract, at the prices specified by the Contractor for the basic contract in Annex 2 to the Contract Billing Elements Tables, Summary Costs, the maximum total duration of the contract, including the right of option may not exceed
What you must prove — eligibility criteria
Dla Części 1: Wykonawca musi wykazać: średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „ Przychód netto ze sprzedaży produktów, towarów i m… ▸▾
Dla Części 1: Wykonawca musi wykazać: posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 4 094 000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla posiadanych … ▸▾
Dla Części 1: Wykonawca musi wykazać się wiedzą i doświadczeniem w wykonaniu lub wykonywaniu w okresie ostatnich 7 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy - to w tym okresie, co najmniej: a) 1 lub 2 lub 3… ▸▾
Dla Części 1: Wykonawca musi wskazać osoby, które będą uczestniczyć w wykonywaniu zamówienia, legitymujące się kwalifikacjami zawodowymi i doświadczeniem odpowiednimi do funkcji, jaka zostanie im powierzona. Wykonawca na każdą funkcję wymienioną poniżej wskaże… ▸▾
Dla Części 2: Wykonawca musi wykazać: średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „ Przychód netto ze sprzedaży produktów, towarów i m… ▸▾
Dla Części 2: Wykonawca musi wykazać: posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 8 352 000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla posiadanych … ▸▾
Dla Części 2: Wykonawca musi wykazać się wiedzą i doświadczeniem w wykonaniu lub wykonywaniu w okresie ostatnich 7 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy - to w tym okresie, co najmniej : a) 1 lub 2 lub … ▸▾
Dla Części 2: Wykonawca musi wskazać osoby, które będą uczestniczyć w wykonywaniu zamówienia, legitymujące się kwalifikacjami zawodowymi i doświadczeniem odpowiednimi do funkcji, jaka zostanie im powierzona. Wykonawca na każdą funkcję wymienioną poniżej wskaże… ▸▾
Dla Części 3: Wykonawca musi wykazać: średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „ Przychód netto ze sprzedaży produktów, towarów i m… ▸▾
Dla Części 3: Wykonawca musi wykazać: posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 8 716 000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla posiadanych … ▸▾
Dla Części 3: Wykonawca musi wykazać się wiedzą i doświadczeniem w wykonaniu lub wykonywaniu w okresie ostatnich 7 lat przed upływem terminu składania ofert, a jeżeli okres prowadzenia działalności jest krótszy - to w tym okresie, co najmniej : a) 1 lub 2 lub … ▸▾
Dla Części 3: Wykonawca musi wskazać osoby, które będą uczestniczyć w wykonywaniu zamówienia, legitymujące się kwalifikacjami zawodowymi i doświadczeniem odpowiednimi do funkcji, jaka zostanie im powierzona. Wykonawca na każdą funkcję wymienioną poniżej wskaże… ▸▾
Dla Części 4: Wykonawca musi wykazać: średni roczny przychód za ostatnie trzy lata obrotowe, a jeżeli okres prowadzenia działalności jest krótszy, za ten okres (na podstawie „Rachunku zysków i strat” pozycja „ Przychód netto ze sprzedaży produktów, towarów i m… ▸▾
Dla Części 4: Wykonawca musi wykazać: posiadanie środków finansowych lub zdolności kredytowej w wysokości nie mniejszej niż 8 625 000,00 PLN. Wartości podane w dokumentach w walutach innych niż wskazane przez Zamawiającego należy przeliczyć: - dla posiadanych … ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Drogowo-Mostowe S.A. | 2 | 2025–2026 |
| mToilet Sp. z o.o. | 2 | 2026 |
| Telway Sp. z o.o. | 1 | 2025 |
| Przedsiębiorstwo Usługowo-Handlowe AUTO-SERVICE E. Markowicz, E. i W. Zagórski Spółka Jawna | 1 | 2025 |
| FHU „AUTO” Jan Baraniewicz | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.