Construction of renewable energy installations in the communes of the Vistula Energy Cluster
Budowa instalacji odnawialnych źródeł energii na terenie Gmin Nadwiślańskiego Klastra Energii
Poland · Drwinia · how to bid here →
Your path to submission
- Deadline: 5 October at 17:00 — 2 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL, POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 10 months (3 awards, most recently December 2025) — by that rhythm the next award was due around September 2026. The last award went to TAURON Sprzedaż sp. z o .o..n = 3
- 31% of this buyer's awards went to companies that had already won here before (69 awards since 2021, spread over 48 companies). 69% went to new names.n = 69 awards since 2021
- Not one of the 69 awards with a known winner country has gone to a foreign company so far. Sector average: 1%.n = 69
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,672 recorded awards) — mostly from Spain, Germany, France.
Submission language: POL.
Typical field: median 3 (from 4,384 awards).
What the buyer is looking for
1. The subject-matter of the contract is the design, delivery, installation and commissioning of renewable energy sources, the training of users and the provision of after-sales service as part of the provision of a guarantee during the guarantee period (‘RES’): 1) 436 units of photovoltaic micro-installations, 2) 293 units of electricity storage installations, 3) 26 units of air heat pump installations for central heating and hot water 4) 1 RES energy storage installation using hydrogen technology together with the photovoltaic installation of power generation, hereinafter referred to as ‘Installations’. 2. The contracting authority divides the contract into two parts: 1) Part I. ‘Classical RES’, including the implementation of the installations described in paragraph points (1), (2) and (3) of this Chapter of the EMS; 2) Part II. ‘Hydrogen installation’, including the implementation of the installation described in paragraph Paragraph 1(4) of this Chapter of the FTZ.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in Polish.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| "WOD-GAZ" Zakład Robót Inżynieryjno-Transportowych Czesław Sztuk | 5 | 2023–2026 |
| Firma Handlowo-Usługowa EL-BUD Leszek Wójcik | 4 | 2021–2025 |
| F. H. U. " HYDROCOP " Przyborowski Łukasz | 3 | 2026 |
| P.H.U. MARK TRAWEL Marek Wielgus | 3 | 2024–2026 |
| Firma Handlowo Usługowa KAMBUD Klimek Stanisław | 3 | 2023–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.