SMOD2 - Works - EPC - Design and Realization (Formalized)
SMOD2 - Travaux - EPC -Conception et Réalisation (Formalisé)
France · CASTELNAU-LE-LEZ · how to bid here →
Your path to submission
- Deadline: 5 October at 12:00 — 1 day left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Foreign bidders
In France · Construction work, 1,628 contracts went to foreign companies over the last 3 years (of 45,578 recorded awards) — mostly from Germany, Spain, Italy.
Submission language: FRA.
Typical field: median 6 (from 41,379 awards).
What the buyer is looking for
This consultation concerns the design, installation, commissioning of the plant on the one hand, and operation and maintenance on the other. The design, installation and commissioning part of the photovoltaic power plant (firm section) includes: design, partial supply of equipment, complete installation and testing until industrial commissioning. The maintenance part (optional section) includes the commissioning, operation, preventive maintenance and curative maintenance of the photovoltaic power plant.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French, English.
Contract
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.