Development of a research-oriented wind generation system for the
Ontwikkeling van een onderzoeksgericht windgeneratiesysteem voor het
Belgium · Gent · how to bid here →
Your path to submission
- Deadline: 19 October at 16:00 — 15 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (40 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to Becton Dickinson Benelux.n = 40
- 30% of awards went to companies from abroad (344 awards with a known winner country). Sector average: 52%.n = 344
- 6% of this buyer's awards went to companies that had already won here before (344 awards since 2015, spread over 137 companies). 94% went to new names.n = 344 awards since 2015
- The median procedure drew 2 bids (257 procedures with a bid count); 32% ended with a single bidder. Sector: median 2 bids.n = 257
- Across 9 procedures with structured selection criteria, this buyer most often required: Professional liability insurance (7 of 9), References: supplies (7 of 9), References: services (2 of 9), Share of subcontractors (2 of 9).n = 9
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · Laboratory & optical equipment, 304 contracts went to foreign companies over the last 3 years (of 748 recorded awards) — mostly from Germany, France, Netherlands.
Typical field: median 1 (from 18 awards).
What the buyer is looking for
This contract concerns the development, supply and installation of a research-oriented wind generation system for the Coastal & Ocean Basin Ostend The Coastal & Ocean Basin (COB) is located in the Maritime Research Centre of the Flemish Government in Ostend (UGent Ostend Science Park). It is designed to study the effect of waves and currents on coastal hydraulic structures and offshore/floating installations, such as the new energy island in the North Sea or nature-based solutions for erosion protection around the foundation of offshore wind turbines. The hydrodynamic and constructive behaviour of new technologies for offshore renewable energy generation is also examined here (e.g. wave energy converters, floating solar panels at sea, floating wind turbines). The Coastal & Ocean Basin welcomes users from industry, academia and government agencies.
What you must prove — eligibility criteria
Een lijst van de voornaamste relevante projecten van soortgelijke omvang die gedurende de afgelopen vijf jaar werden uitgevoerd, met vermelding van naam instelling, datum, contactpersoon en korte beschrijving van de opdracht. Minimumeisen: Aanleveren van een g… ▸▾
Opgave van de al dan niet tot de onderneming van de inschrijver behorende onderzoekers/personeelsleden die bij de uitvoering van het project betrokken zouden worden, inclusief referenties m.b.t. hun expertise op het gebied van windgeneratie (bv. middels een li… ▸▾
Het UEA, waarmee de ondernemer verklaart dat hij zich niet bevindt in een van de uitsluitingssituaties als bedoeld in de artikelen 67 tot 69 van de wet van 17 juni 2016. Artikel 70 van de wet van 17 juni 2016 betreffende de overheidsopdrachten is van toepassin… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Thermo Fisher Scientific | 4 | 2022 |
| Waters | 3 | 2022–2026 |
| Bruker Belgium | 2 | 2022–2025 |
| Artoos | 2 | 2022–2025 |
| MONUMENT - VANDEKERCKHOVE | 2 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.