Maintenance of the sand settling tank located between Składowa Street and the "Nila" General A. E. Fieldorf Tunnel
Utrzymanie osadnika piasku usytuowanego pomiędzy ul. Składową a tunelem im. gen. A. E. Fieldorfa „Nila”
Poland · Białystok · how to bid here →
Your path to submission
- Deadline: 20 October at 00:00 — 32 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 3 months (41 awards, most recently June 2026) — the next award is due around October 2026 by that rhythm. The last award went to KOMA Białystok Sp. z o.o..n = 41
- The award came in at a median 67% of the estimated value (25 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 97%.n = 25
- 39% of this buyer's awards went to companies that had already won here before (1,151 awards since 2015, spread over 471 companies). 61% went to new names.n = 1,151 awards since 2015
- The median procedure drew 3 bids (285 procedures with a bid count); 22% ended with a single bidder. Sector: median 3 bids.n = 285
- 5% of awards went to companies from abroad (1,151 awards with a known winner country). Sector average: 0%.n = 1,151
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 17/09/2026.
Foreign bidders
In Poland · Cleaning, environment & waste, 40 contracts went to foreign companies over the last 3 years (of 56,378 recorded awards) — mostly from Bulgaria, France, Czechia.
Typical field: median 3 (from 24 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
1. Przedmiotem zamówienia jest wykonywanie prac związanych z utrzymaniem w sposób ciągły, tj. przez całą dobę, drożności osadnika piasku usytuowanego pomiędzy ul. Składową a tunelem im. gen. A. E. Fieldorfa „Nila”, w tym wykonywanie prac związanych z konserwacją, oczyszczaniem, usuwaniem powstałych awarii. 2. Dalszy opis zgodnie z rozdz. III SWZ.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POL.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Przedsiębiorstwo Budownictwa Wodnego „HYDROS” Tadeusz Kulesza, Adam Kulesza Sp. J. | 27 | 2021–2026 |
| Biuro Obsługi Nieruchomości „GEOTAKSACJA” Piotr Gierasimiuk | 26 | 2021–2026 |
| BBGM Sp. z o.o. | 26 | 2022–2026 |
| Wycena Nieruchomości Joanna B. Waluk ̶Pacholska | 17 | 2021–2026 |
| WALMAR Waldemar Gajko | 17 | 2022–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.