Friedrich & ClementBETA

COMPREHENSIVE SUPPLY OF ELECTRICAL ENERGY FOR POINTS WITH RES INSTALLATIONS FOR THE PURCHASING GROUP OF WISZNICE MUNICIPALITY

KOMPLEKSOWA DOSTAWA ENERGII ELEKTRYCZNEJ DLA PUNKTÓW Z INSTALACJAMI OZE NA POTRZEBY GRUPY ZAKUPOWEJ GMINY WISZNICE

Poland · Wisznice · how to bid here

Your path to submission

  1. Deadline: 22 October at 00:00 — 34 days left.
  2. The submission point is stated in the notice (link on the right).
  3. Offer and evidence in: POL.
  4. Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Compiled automatically from notice and documents — no guarantee; the procedure's wording is binding.

Clement What the numbers say about this buyer

  • 18% of this buyer's awards went to companies that had already won here before (46 awards since 2021, spread over 33 companies). That is well below the sector norm (35%) — this buyer switches suppliers more often than others.n = 46 awards since 2021
  • The median procedure drew 4 bids (5 procedures with a bid count); 20% ended with a single bidder. Sector: median 3 bids.n = 5
  • 2% of awards went to companies from abroad (46 awards with a known winner country). Sector average: 0%.n = 46

From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.

Clement
References and certificates from your home country count fully across the EU — that is what European procurement law is for.

Foreign bidders

In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,459 recorded awards) — mostly from Spain, Germany, France.

Typical field: median 3 (from 4,284 awards).

Measured from linked award data; foreign winners bidding through a local subsidiary count as domestic — the true share is higher.

What the buyer is looking for

The summary in English is being prepared. The official description below is in the original language (DE).

Show original description (DE)

Przedmiotem niniejszego zamówienia jest KOMPLEKSOWA DOSTAWA ENERGII ELEKTRYCZNEJ DLA PUNKTÓW Z INSTALACJAMI OZE NA POTRZEBY GRUPY ZAKUPOWEJ GMINY WISZNICE dla obiektów wskazanych w zał. nr 1 do SWZ, zgodnie z przepisami ustawy z dnia 10 kwietnia 1997r. Prawo energetyczne, Kodeksu Cywilnego oraz przepisami wykonawczymi wydanymi na ich podstawie. Szacunkowe zapotrzebowanie energii elektrycznej w okresie od 01.01.2027 r. do 31.12.2028 r. wynosi 2 034 434 kWh.

Description as published (DE).

Selection criteria — in the procurement documents

The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POL.

Contract

BuyerGmina Wisznice
TypeSupplies
Estimated valuevalue not published
Published17 September 2026
CategoryPetroleum & fuels · CPV 09000000

Who has won here before

CompanyAwardsPeriod
Gminny Zakład Komunalny w Wisznicach Sp. z o.o.42022–2025
Przedsiębiorstwo Robót Drogowo-Mostowych Parczew Spółka Akcyjna32023–2025
PRZEDSIĘBIORSTWO ROBÓT DROGOWYCH SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ22022–2024
Usługi Projektowe MIDTECH Michał Kołodziejczyk22026
DACH STYL M.K. SMOLIŃSCY SP. J.22022–2025
From 13.7M documented awards · regular winners know this buyer's requirements — that is your competition.

How often this buyer tenders this

20241
20251
20261

Who knows the rhythm prepares instead of reacting.

·
days until the deadlineThursday 22 October at 00:00

How to bid

Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.

Read the full noticeOriginal + documents
Goes directly to this tender on TED — Tenders Electronic Daily. The full specification and all annexes are there.

Tender documents — direct download

Specifications and annexes hosted by the buyer — usually accessible without registration.
Tenders like this, every morning at 7:30 in your inbox.
Register now →