Supplementary Contract Enedis Source Position Environmental Consultation and Studies SOUTH EAST
Marché complémentaire Poste Source enedis concertation et études environnementales SUD EST
France · Paris La Défense cedex · how to bid here →
Your path to submission
- Deadline: 15 October at 23:45 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 47% of awards went to companies from abroad (133 awards with a known winner country). Sector average: 7%.n = 133
- In this sector the buyer awards roughly every 2 months (8 awards, most recently January 2025) — by that rhythm the next award was due around March 2025. The last award went to DEJANTE ENERGIE SUD OUEST.n = 8
- 2% of this buyer's awards went to companies that had already won here before (133 awards since 2017, spread over 70 companies). That is well below the sector norm (19%) — this buyer switches suppliers more often than others.n = 133 awards since 2017
- The median procedure drew 4 bids (5 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 5
- Across 7 procedures with structured selection criteria, this buyer most often required: Staff qualifications (1 of 7).n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In France · Architecture & engineering, 986 contracts went to foreign companies over the last 3 years (of 24,814 recorded awards) — mostly from Germany, Spain, Italy.
Typical field: median 5 (from 22,212 awards).
What the buyer is looking for
The purpose of the contract is to carry out administrative procedures and environmental studies for projects to create and extend the Enedis zone SUD EST source paste (AURA, SUD EST and OCCITANIA): 1 - Framing study (overview of the project with an initial ERC analysis) 2 - Land research that takes into account environmental ERC indicators and technical indicators (slope, access, PLU) and assistance a! acquisition 3 - DPP - Project presentation file (Circular FERRACCI) 4 - Application file for case-by-case review 5 - Impact studies 6 - Ecological pre-diagnoses and ecological inventories 7 - Consultation of mayors and services (article 323-25) 8 - Photomontages 9 - Reprographies of documents 10 - Application file for a Declaration of Public Utility (DUP) 11. File released in compatibility of urban planning documents and PLU12. 12. Water Act file. Geographical perimeters of MOAD PS - SOUTH EST
What you must prove — eligibility criteria
Le candidat présentera une liste des principales études environnementales effectuées au cours des 5 dernières années de même nature que les prestations faisant l'objet du marche, démontrant son savoir-faire sur les prestations de réalisation des dossier a prod… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| PRYSMIAN CSF | 2 | 2024–2026 |
| IMACAB SA | 2 | 2024–2026 |
| ETABLISSEMENT VEZIE | 1 | 2026 |
| Adunéo | 1 | 2024 |
| INEO RESEAUX CENTRE ATLANTIQUE | 1 | 2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.