Framework agreement for the supply and management of meal vouchers
Accord-cadre de fourniture et de gestion des titres restaurant
France · Besancon Cedex · how to bid here →
Your path to submission
- Deadline: 19 October at 00:00 — 31 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 69% of the bids received came from small and medium-sized enterprises (40 procedures with a bid mix). Sector: 25%.n = 40
- The median procedure drew 5 bids (409 procedures with a bid count); 4% ended with a single bidder. Sector: median 3 bids.n = 409
- The award came in at a median 45% of the estimated value (19 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 66%.n = 19
- 21% of this buyer's awards went to companies that had already won here before (631 awards since 2015, spread over 336 companies). 79% went to new names.n = 631 awards since 2015
- 0% of the bids received came from other countries (40 procedures with a bid mix) — all bidders, not just the winners. Sector: 11%.n = 40
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In France · Financial & insurance services, 137 contracts went to foreign companies over the last 3 years (of 7,122 recorded awards) — mostly from Germany, Spain, Italy.
Typical field: median 5 (from 6 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Montant HT estimé pour la durée totale du contrat : 7500000.0 Euro(s) H.T. Les seuils sont exprimés en quantité au sein des documents de la consultation. L'accord-cadre sera exécuté par l'émission de bons de commande. Les prestations sont réglées par des prix unitaires
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in FRA.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Bureau Veritas Construction · Berlin | 4 | 2025–2026 |
| AC ENVIRONNEMENT | 4 | 2024–2025 |
| PARIETTI | 4 | 2025–2026 |
| SOCOTEC CONSTRUCTION | 4 | 2025–2026 |
| APAVE INFRASTRUCTURES ET CONSTRUCTION FRANCE | 4 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.