Advanced Combustion Control System (ACCS)
Geavanceerd verbrandingsoptimalisatiesysteem (ACCS)
Belgium · Gent · how to bid here →
Your path to submission
- Deadline: 15 October at 12:00 — 12 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — use the eligibility analysis above: it lists the requirements and, for known certificates, how to get them.
Clement What the numbers say about this buyer
- 11% of awards went to companies from abroad (54 awards with a known winner country). Sector average: 30%.n = 54
- 13% of this buyer's awards went to companies that had already won here before (54 awards since 2020, spread over 45 companies). 87% went to new names.n = 54 awards since 2020
- The median procedure drew 3 bids (43 procedures with a bid count); 21% ended with a single bidder. Sector: median 2 bids.n = 43
- The award came in at a median 86% of the estimated value (5 awards with both estimate and value) — pricing at the estimate is usually too high here.n = 5
- Across 3 procedures with structured selection criteria, this buyer most often required: References: supplies (3 of 3), Minimum annual turnover (3 of 3), Quality control by institutes (2 of 3).n = 3
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 27/09/2026.
Foreign bidders
In Belgium · Industrial machinery, 88 contracts went to foreign companies over the last 3 years (of 363 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 2 (from 224 awards).
What the buyer is looking for
The present contract concerns one lot and includes the design, delivery, configuration, integration, testing and commissioning of an Advanced Combustion Control System (ACCS) for the optimization of the incineration process on furnace lines 1 and 2 of the waste energy plant (AEC) of IVAGO. The ACCS should complement the existing basic control in SCADA (Supervisory control and data acquisition) with an advanced optimization layer that automatically adjusts set points for more stable and efficient combustion and steam production. The system shall also have monitoring and reporting functionalities to monitor, analyse and report on the operational and technical performance of the incineration process. Objectives: • Stabilization of furnace combustion and steam production • Increase of waste throughput • Increase of energy yield (steam production) • Reduction of auxiliary fuel • Reduction of…
Show full description
… operator interventions • Reduction of raw materials needed to control emissions • The system should also function as a monitoring or reporting tool The contract is considered to be a fixed-price contract, covering all works and supplies as specified in the tender specifications. The whole must be integrated into the existing automation and control environment of the installation. The solution should be implemented on a PC-based server or workstation with sufficient capacity to continuously collect, process, analyze and store the necessary process data. The contractor must provide all necessary software, licenses, communication components and system configurations necessary for a fully operational system. The contractor defines the required communication with SCADA and implements it. The proposed solution should be suitable for continuous operation and should take into account the required availability, reliability and cybersecurity of the installation. The implementation can only continue during a planned shutdown of the power plant in 2027. An exact date has not yet been set, but this will be after 31 March 2027. The contractor must commit to be ready for implementation by 31 March 2027 at the latest.
What you must prove — eligibility criteria
De financiële en economische draagkracht van de kandidaat zal worden beoordeeld op basis van de jaarrekening. Als vereiste bewijsstukken worden de 2 meest recente jaarrekeningen bezorgd. Minimumeisen: De kandidaat heeft tijdig en reglementair de jaarrekeningen… ▸▾
Het UEA, waarmee de ondernemer verklaart dat hij zich niet bevindt in een van de uitsluitingssituaties als bedoeld in de artikelen 67 tot 69 van de wet van 17 juni 2016. Artikel 70 van de wet van 17 juni 2016 betreffende de overheidsopdrachten is van toepassin… ▸▾
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Scania Belgium | 2 | 2024–2025 |
| Veolia Environmental Services BE | 2 | 2026 |
| MOL CY | 2 | 2024 |
| TRAFLUX | 2 | 2025–2026 |
| Powerpack | 2 | 2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.