Expansion of computing infrastructure for the implementation and development of artificial intelligence solutions
Rozbudowa infrastruktury obliczeniowej na potrzeby wdrażania i rozwoju rozwiązań sztucznej inteligencji
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 23 September at 00:00 — 6 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 4 months (28 awards, most recently September 2026) — the next award is due around December 2026 by that rhythm. The last award went to MAXTO ITS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ.n = 28
- 32% of this buyer's awards went to companies that had already won here before (557 awards since 2017, spread over 187 companies). 68% went to new names.n = 557 awards since 2017
- 14% of awards went to companies from abroad (557 awards with a known winner country). Sector average: 1%.n = 557
- The median procedure drew 2 bids (317 procedures with a bid count); 45% ended with a single bidder. Sector: median 1 bids.n = 317
- The award came in at a median 96% of the estimated value (7 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 99%.n = 7
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 16/09/2026.
Foreign bidders
In Poland · Software & IT systems, 63 contracts went to foreign companies over the last 3 years (of 15,807 recorded awards) — mostly from Germany, Czechia, Croatia.
Typical field: median 1 (from 8 awards).
What the buyer is looking for
1. The subject of the contract is the provision by the Contractor of two servers with the necessary equipment, components, subassemblies, wiring and technical documentation of the manufacturer together with software licenses necessary for their proper operation, configuration, diagnosis, monitoring and remote management together with warranty service for a period of 36 months. 2. A detailed description of the subject of the contract is contained in the Description of the subject of the contract (OPZ), which is Annex 1 to the FTZ, and in the Draft provisions of the contract (PPU), which is Annex 2 to the FTZ.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POL.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| UNIMOT ENERGIA I GAZ SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 37 | 2024–2025 |
| EKOVOLTIS SPÓŁKA Z OGRANICZONĄ ODPOWIEDZIALNOŚCIĄ | 20 | 2024 |
| Veolia Energy Contracting Poland Sp. z o.o. | 20 | 2024 |
| ONE S.A. | 16 | 2024 |
| JETA Aviation GmbH | 9 | 2021–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.