Unrestricted tender for the supply and purchase of electricity - Purchasing Group No. 174/2026 Voltra
Przetarg nieograniczony na dostawę i odkup energii elektrycznej - Grupa Zakupowa nr 174/2026 Voltra
Poland · Warszawa · how to bid here →
Your path to submission
- Deadline: 24 September at 00:00 — 7 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: POL.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 85% of this buyer's awards went to companies that had already won here before (104 awards since 2023, spread over 16 companies). That is well above the sector norm (35%) — newcomers have a harder time here than elsewhere.n = 104 awards since 2023
- In this sector the buyer awards roughly every month (104 awards, most recently April 2026) — by that rhythm the next award was due around May 2026. The last award went to IGNITIS POLSKA Sp. z o.o..n = 104
- 0% of the bids received came from small and medium-sized enterprises (5 procedures with a bid mix). Sector: 63%.n = 5
- The award came in at a median 48% of the estimated value (36 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 92%.n = 36
- The median procedure drew 4 bids (102 procedures with a bid count); 8% ended with a single bidder. Sector: median 3 bids.n = 102
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Poland · Petroleum & fuels, 91 contracts went to foreign companies over the last 3 years (of 25,443 recorded awards) — mostly from Spain, Germany, France.
Typical field: median 4 (from 102 awards).
What the buyer is looking for
The subject of the contract is the supply and repurchase of electricity in accordance with the applicable regulations, quality standards of the EP Act and implementing regulations, in particular the Regulation of the Minister for Climate and the Environment of 22 March 2023 on detailed conditions for the operation of the electricity system for subjective off-take points participating in the procedure, a list of which can be found in the Specifications of the Contract Conditions.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in POL.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Respect Energy S.A. | 26 | 2024–2025 |
| Veolia Energy Contracting Poland Sp. z o.o. | 19 | 2024–2025 |
| ENEA S.A. | 11 | 2024–2025 |
| Unimot Energia i Gaz Sp. z o.o. | 10 | 2024–2026 |
| PGE Obrót S.A. | 7 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on e-Zamówienia (Polen) → Registration, signature, fees — from the operator's bidder manual.