Maintenance of public lighting municipality Smallingerland 2027 - 2030
Onderhoud openbare verlichting gemeente Smallingerland 2027 - 2030
Netherlands · DRACHTEN · how to bid here →
Your path to submission
- Deadline: 2 November at 00:00 — 46 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 19 bids (181 procedures with a bid count); 9% ended with a single bidder. Sector: median 3 bids.n = 181
- In this sector the buyer awards roughly every month (3 awards, most recently September 2025) — by that rhythm the next award was due around October 2025. The last award went to SKIDATA B.V..n = 3
- 3% of this buyer's awards went to companies that had already won here before (186 awards since 2015, spread over 145 companies). 97% went to new names.n = 186 awards since 2015
- 69% of the bids received came from small and medium-sized enterprises (147 procedures with a bid mix). Sector: 36%.n = 147
- 2% of awards went to companies from abroad (186 awards with a known winner country). Sector average: 5%.n = 186
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Netherlands · Repair & maintenance, 49 contracts went to foreign companies over the last 3 years (of 1,187 recorded awards) — mostly from Germany, France, Belgium.
Typical field: median 2 (from 3 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Beheer en onderhoud openbare verlichting 2027-2030 gemeente Smallingerland. EUR 1.200.000,00
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Stichting Alliade | 3 | 2024–2025 |
| Stam B.V. | 2 | 2024–2025 |
| Pranger-Rosier Installaties B.V. | 2 | 2025 |
| USG Restart BV | 2 | 2024–2025 |
| Caparis N.V. | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.