Geophysical Survey of Wind Farm Search Area 6/7
Netherlands · Den Haag · how to bid here →
Your path to submission
- Deadline: 7 December at 00:00 — 81 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: ENG, ENG.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (20 awards, most recently February 2025) — by that rhythm the next award was due around March 2025. The last award went to Galan Interim Management BV.n = 20
- The award came in at a median 52% of the estimated value (14 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 90%.n = 14
- The median procedure drew 3 bids (307 procedures with a bid count); 16% ended with a single bidder. Sector: median 5 bids.n = 307
- 24% of awards went to companies from abroad (329 awards with a known winner country). Sector average: 8%.n = 329
- 4% of this buyer's awards went to companies that had already won here before (329 awards since 2018, spread over 100 companies). 96% went to new names.n = 329 awards since 2018
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Netherlands · Architecture & engineering, 127 contracts went to foreign companies over the last 3 years (of 2,639 recorded awards) — mostly from Germany, France, United Kingdom.
Typical field: median 4 (from 20 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
The offshore survey activities are planned to be executed in 2027. Data processing and interpretation activities are expected to be completed in 2028. The resulting data will be made available to potential bidders for future offshore wind farm development in the Netherlands. The objective of the geophysical survey is to improve the understanding of the bathymetrical, morphological and geological conditions within the wind farm zone and to identify potential objects. The survey will provide geophysical information to support the preparation of geotechnical investigations and to facilitate the design and installation planning of future offshore wind farms. See Tender Document
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in ENG, ENG.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Resilience B.V. | 4 | 2024 |
| Fair & Sustainable Consulting | 2 | 2024 |
| Fugro Netherlands Marine B.V. · Nootdorp | 2 | 2024 |
| Partners for Innovation B.V. · Amsterdam | 2 | 2024–2025 |
| ICI Business | 2 | 2022–2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.