Framework agreement for geotechnical and hydrogeotechnical studies
Accord-cadre études géotechniques et hydrogéotechniques
France · Paris · how to bid here →
Your path to submission
- Deadline: 19 October at 00:00 — 32 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 4% of this buyer's awards went to companies that had already won here before (101 awards since 2016, spread over 66 companies). That is well below the sector norm (20%) — this buyer switches suppliers more often than others.n = 101 awards since 2016
- The median procedure drew 4 bids (31 procedures with a bid count); 0% ended with a single bidder. Sector: median 5 bids.n = 31
- 5% of awards went to companies from abroad (101 awards with a known winner country). Sector average: 7%.n = 101
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In France · Architecture & engineering, 975 contracts went to foreign companies over the last 3 years (of 24,626 recorded awards) — mostly from Germany, Spain, Italy.
Typical field: median 5 (from 21,879 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
La description du marché est précisée dans le cahier des charges
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in FRA, FRA.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| D&A SELAS D’ARCHITECTURE | 2 | 2025 |
| Eiffage SCBM | 2 | 2016–2019 |
| ALTO STEP | 2 | 2025 |
| CABINET ALTIUS SELAS | 2 | 2019–2023 |
| BESNARD & CHAUVIN MARICHEZ | 1 | 2016 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.