Maintenance and support of HP XP7 storage infrastructure
Maintenance et support de l’infrastructure de stockage HP XP7
Belgium · Saint-Gilles · how to bid here →
Your path to submission
- Deadline: 5 October at 00:00 — 20 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD, FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (5 awards, most recently September 2025) — by that rhythm the next award was due around December 2025. The last award went to Veolia SA.n = 5
- 16% of this buyer's awards went to companies that had already won here before (195 awards since 2015, spread over 72 companies). 84% went to new names.n = 195 awards since 2015
- 33% of awards went to companies from abroad (195 awards with a known winner country). Sector average: 23%.n = 195
- The award came in at a median 97% of the estimated value (6 awards with both estimate and value) — pricing at the estimate is usually about right here. Sector: 87%.n = 6
- The median procedure drew 2 bids (116 procedures with a bid count); 45% ended with a single bidder. Sector: median 2 bids.n = 116
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In Belgium · Repair & maintenance, 163 contracts went to foreign companies over the last 3 years (of 979 recorded awards) — mostly from France, Germany, Italy.
Typical field: median 2 (from 573 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Le présent Marché Public concerne des services de maintenance et support de l’infrastructure de stockage HP XP7.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD, FRA.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Fujitsu Technology Solutions | 7 | 2015–2026 |
| SoftwareOne BE | 6 | 2025–2026 |
| Prodata Systems | 4 | 2015–2025 |
| CRONOS PUBLIC SERVICES | 3 | 2024–2025 |
| CEGEKA | 3 | 2024–2025 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.