Technical study road segment N9 in Aalst (km 26.1 - 27.1): roundabout Haring N9 x N45 and Parklaan
Technische studie wegsegment N9 te Aalst (kmpt. 26,1 - 27,1): rotonde Haring N9 x N45 en Parklaan
Belgium · Brussel · how to bid here →
Your path to submission
- Deadline: 29 September at 00:00 — 14 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every month (137 awards, most recently August 2026) — the next award is due around September 2026 by that rhythm. The last award went to Al-Jawad Pike.n = 137
- 24% of this buyer's awards went to companies that had already won here before (935 awards since 2022, spread over 691 companies). That is well above the sector norm (9%) — newcomers have a harder time here than elsewhere.n = 935 awards since 2022
- The award came in at a median 93% of the estimated value (17 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 85%.n = 17
- The median procedure drew 5 bids (522 procedures with a bid count); 10% ended with a single bidder. Sector: median 5 bids.n = 522
- 18% of awards went to companies from abroad (935 awards with a known winner country). Sector average: 16%.n = 935
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 15/09/2026.
Foreign bidders
In Belgium · Architecture & engineering, 265 contracts went to foreign companies over the last 3 years (of 2,100 recorded awards) — mostly from France, Germany, Netherlands.
Typical field: median 4 (from 91 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Het voorwerp van de opdracht is een technische vervolgstudie van het projectgebied N9 Haring - Parklaan. Het concept werd bepaald in de goedgekeurde startnota, in deze opdracht wordt de projectnota (enkel rotonde Haring) opgemaakt en de vervolgstappen (detailontwerp, omgevingsvergunning, opmaak aanbestedingsbundel en begeleiding in uitvoering).
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Sweco Belgium | 11 | 2024–2026 |
| Krinkels | 10 | 2024–2026 |
| WILLEMEN INFRA | 10 | 2024–2026 |
| A.B.O.G. | 9 | 2024–2026 |
| STADSBADER CONTRACTORS | 6 | 2024–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.