LEVELLING OF CONTAINER QUAYS - RELAUNCH 2
NIVELLEMENT DES QUAIS CONTENEURS- RELANCE 2
France · Pointe à Pitre cédex · how to bid here →
Your path to submission
- Deadline: 8 October at 00:00 — 23 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- 11% of this buyer's awards went to companies that had already won here before (222 awards since 2015, spread over 139 companies). That is well below the sector norm (26%) — this buyer switches suppliers more often than others.n = 222 awards since 2015
- The median procedure drew 4 bids (43 procedures with a bid count); 7% ended with a single bidder. Sector: median 6 bids.n = 43
- 15% of awards went to companies from abroad (222 awards with a known winner country). Sector average: 4%.n = 222
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 13/09/2026.
Foreign bidders
In France · Construction work, 1,610 contracts went to foreign companies over the last 3 years (of 45,087 recorded awards) — mostly from Germany, Spain, Italy.
Typical field: median 6 (from 40,639 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (DE).
Show original description (DE)
Dans le cadre des aménagements de ses infrastructures, le GPMG a pour projet de disposer de 300 ml de quai avec un tirant d'eau admissible de 15m pour les lignes PCRF XL. L'objectif de la tranche ferme est d'obtenir 15 mètres de tirant d'eau admissible suivant la longueur du Quai 12. Une tranche optionnelle est prévue au marché pour atteindre 14 mètres de tirant d'eau admissible devant le Quai 13
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in FRA.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| TSA SOGETRAS | 5 | 2015–2020 |
| SOGETRA | 4 | 2017–2021 |
| ECODEC | 4 | 2018–2022 |
| SCHNEIDER ELECTRIC FRANCE | 3 | 2017–2022 |
| GETELEC TP SAS | 3 | 2016–2021 |
How to bid
Guide: how to apply on PLACE — Plateforme des achats de l'État (Frankreich) → Registration, signature, fees — from the operator's bidder manual.