Havendijk Den Helder Nieuwe Diep/Nieuwe Werk/Visafslag
Netherlands · Heerhugowaard · how to bid here →
Your path to submission
- Deadline: 17 November at 00:00 — 68 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (20 awards, most recently July 2026) — the next award is due around September 2026 by that rhythm. The last award went to Beentjes GWW.n = 20
- 4% of this buyer's awards went to companies that had already won here before (259 awards since 2015, spread over 96 companies). That is well below the sector norm (17%) — this buyer switches suppliers more often than others.n = 259 awards since 2015
- The award came in at a median 70% of the estimated value (28 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 100%.n = 28
- The median procedure drew 3 bids (203 procedures with a bid count); 28% ended with a single bidder. Sector: median 4 bids.n = 203
- 11% of awards went to companies from abroad (259 awards with a known winner country). Sector average: 2%.n = 259
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 09/09/2026.
Foreign bidders
In Netherlands · Construction work, 30 contracts went to foreign companies over the last 3 years (of 2,334 recorded awards) — mostly from Belgium, Germany, Italy.
Typical field: median 3 (from 13 awards).
What the buyer is looking for
De aanbestedingsprocedure betreft een Opdracht voor werken bestaande uit de Havendijk Den Helder delen Het Nieuwe Diep I & II, Het Nieuwe Werk en De Visafslag. Zie de aanbestedingsstukken
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in NLD.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| RPS advies- en ingenieursbureau B.V. | 3 | 2024–2025 |
| Gebr. Beentjes Grond- Weg- en Waterbouw B.V. | 2 | 2025 |
| ASV-Services B.V. | 2 | 2026 |
| HABO B.V. | 2 | 2024–2025 |
| IMD B.V. | 2 | 2024 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.