How to bid in this country: portals, deadlines, thresholds →
Photovoltaic plants DIS 2026
Solcellsanläggningar DIS 2026 — original title
Your path to submission
- Deadline for requests to participate: 2 September 2036 at 23:59 — 3594 days left. Two-stage procedure: by this deadline you submit a request to participate (proof of eligibility). Only shortlisted firms are then invited to submit a tender.
- The submission point is stated in the notice (link on this page).
- Offer and evidence in: Swedish.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The DPS includes the procurement of turnkey PV installations. Under the DPS, contracting authorities can carry out procurements of photovoltaic systems of varying sizes and designs, such as rooftop and ground-mounted installations, photovoltaic parks, as well as building-integrated photovoltaic solutions.
Contract
Type of service
Clement What the numbers say about this buyer
- The median procedure drew 11 bids (209 procedures with a bid count); 10% ended with a single bidder. Sector: median 8 bids.n = 209
- 12% of this buyer's awards went to companies that had already won here before (212 awards since 2020, spread over 104 companies). 88% went to new names.n = 212 awards since 2020
- 5% of awards went to companies from abroad (212 awards with a known winner country). Sector average: 3%.n = 212
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on this page), not in the EU form. The document analysis below extracts them from there — bid and evidence in Swedish.
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Wismo Automotive AB | 3 | 2026 |
| Volkswagen Group Sverige AB | 3 | 2026 |
| Toyota Sweden AB | 3 | 2026 |
| Astara Ital Sweden AB | 3 | 2026 |
| RN Nordic AB | 3 | 2026 |
Tactics
When this buyer has awarded in this sector, usually 6 or more bids came in. Many compete here — price and references decide. (Based on 6 completed awards — not a statement about this procedure.)
This procedure allows 3649 days between publication and deadline — typical in this country is 31 (median of 1,279 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In Sweden · Construction work, 6 contracts went to foreign companies over the last 3 years (of 839 recorded awards).
Submission language: Swedish.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now