How to bid in this country: portals, deadlines, thresholds →
Koningswei in Tilburg, participation Construction team and possibly subsequent realization including 2-year maintenance
Koningswei te Tilburg, deelname Bouwteam en eventueel aansluitend realisatie inclusief 2-jarig onderhoud — original title
Your path to submission
- Deadline: 13 November at 10:00 — 12 days left.
- You submit on TenderNed — not here and not by e-mail. ↗ Submission via TenderNed with an eHerkenning account — issuance for foreign firms can take time; apply early. Sort out account and signature first — not on submission day.
- Offer and evidence in: Dutch.
- Collect your evidence — use the eligibility analysis on this page: it lists the requirements and, for known certificates, how to get them.
What the buyer is looking for
The Contracting Authority is looking for 1 Contractor to conclude an Agreement that oversees the Assignment "Koningswei in Tilburg, participation in the Construction Team and possibly subsequent realisation including 2-year maintenance" for the Spatial and Spatial Implementation departments of the Municipality of Tilburg. The Koningswei project concerns the redevelopment of the Koningsplein in the centre of Tilburg. The existing predominantly stony square will be transformed into a green residential park – an intensive green roof/roof garden on the deck of the existing Koningsplein car park. The Assignment consists of two phases that are tendered in conjunction with each other: Phase 1 - Construction team phase (Services) and Phase 2 - Realization and maintenance phase (Working). The core of the task lies in the intensive green roof / roof garden: construction of a park on the deck of…
Show full description
… the existing parking garage, equipped with trees (in tree bunkers) that need a preparation process, shrubs, perennials, a water retention and infiltration system, a buffer tank for irrigation, permanent and temporary pavements, playground, rainwater drainage, adaptation and maintenance of the existing pergola. The structural possibilities and watertightness of the existing parking deck form a hard design boundary condition. During the construction team phase, the Contractor is explicitly expected to provide technical added value in terms of manufacturability, phasing, cost control and environmental management in an urban context. The Contractor also acts as V&G coordinator for the design phase and has a coordination obligation vis-à-vis the entire Construction Team, the tree supplier(s) and ancillary contractors for public lighting. Reference is also made to the Tender Document.
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (20 awards, most recently August 2026) — the next award is due around November 2026 by that rhythm. The last award went to C.J.M. van Gaal BV.n = 20
- 7% of this buyer's awards went to companies that had already won here before (326 awards since 2015, spread over 168 companies). 93% went to new names.n = 326 awards since 2015
- The median procedure drew 3 bids (286 procedures with a bid count); 16% ended with a single bidder. Sector: median 4 bids.n = 286
- The award came in at a median 91% of the estimated value (9 awards with both estimate and value) — pricing at the estimate is usually too high here. Sector: 84%.n = 9
- 8% of awards went to companies from abroad (326 awards with a known winner country). Sector average: 2%.n = 326
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Dutch.
Eligibility analysis from the tender documents
Tender documents — direct download
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Thuiszorg INIS B.V. | 3 | 2023–2025 |
| Broeren B.V. | 3 | 2025–2026 |
| Acteon Thuiszorg B.V. | 3 | 2023–2025 |
| Actief Huiszorg B.V. | 3 | 2023–2025 |
| Unihorn BV | 2 | 2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually about 3 bids came in. A normal field for this market. (Based on 19 completed awards — not a statement about this procedure.)
This procedure allows 74 days between publication and deadline — typical in this country is 48 (median of 2,911 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
Foreign bidders
In the Netherlands · Construction work, 31 contracts went to foreign companies over the last 3 years (of 2,446 recorded awards) — mostly from Belgium, Germany, France.
Submission language: Dutch.
How to bid
Don't miss the next one
Friedrich finds tenders like this for you — every morning at 7:30, each one checked by Claude (Anthropic) for fit, and he learns from your feedback what your company really does.
Register now