SR-contract, New Construction, Helsinki, Sörnäinen, Sompasaari, Heka Kalasatama Nihdinranta 8
SR-urakka, Uudisrakennus, Helsinki, Sörnäinen, Sompasaari, Heka Kalasatama Nihdinranta 8 — original title
Your path to submission
- Deadline: 23 November at 12:00 — 22 days left.
- You submit on Hilma — not here and not by e-mail. ↗
- Offer and evidence in: Finnish.
- Collect your evidence — the eligibility requirements are listed on this page; for many of them the analysis explains how to obtain them.
What the buyer is looking for
The subject of the acquisition is the construction of a residential block of flats in Sompasaari, Helsinki, as a fixed-price SR contract, including not only civil engineering works but also all HVAC works and all necessary planning. In addition, the demolition of the light mast on the site with its foundations, possible electrical works, as well as the removal, waste fees and the filling of the demolition area at the excavation level are part of the SR contract. The SR contract includes: - plot 10667/3, Heka Kalasatama Nihdinranta 8 Special features of the project: - the buildings will be connected to the waste suction pipe collection system The design can start after the signature of the preliminary contract. The estimated start date of the construction work is 05/2027 and the works must start no later than 06/2027. The subject of the contract is described in more detail in the…
Show full description
… commercial and technical documents annexed to the invitation to tender. The supporting documents can be found on the Tendering Services page of the publication under the link "Attachments and links".
Contract
Type of service
Clement What the numbers say about this buyer
- In this sector the buyer awards roughly every 2 months (95 awards, most recently September 2026) — the next award is due around November 2026 by that rhythm. The last award went to Arkta Reponen Oy.n = 95
- The award came in at a median 125% of the estimated value (18 awards with both estimate and value) — pricing at the estimate is usually too low here. Sector: 91%.n = 18
- 58% of this buyer's awards went to companies that had already won here before (275 awards since 2018, spread over 95 companies). 42% went to new names.n = 275 awards since 2018
- The median procedure drew 5 bids (186 procedures with a bid count); 9% ended with a single bidder. Sector: median 4 bids.n = 186
- 4% of awards went to companies from abroad (275 awards with a known winner country). Sector average: 2%.n = 275
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 01/11/2026.
Selection criteria — via the ESPD
The buyer states in the notice that eligibility is proven through the European Single Procurement Document (ESPD); the concrete requirements are in the tender documents. The document analysis below extracts them from there — bid and evidence in Finnish.
Tender documents — direct download
Part of a larger project
- Uudisrakennus, Helsinki, Sörnäinen, Sompasaari, Heka Kalasatama Nihdinranta 8Deadline 23 Novthis lot
- UudisrakennusDeadline 22 Jan
Who has won at this buyer so far
Across all contract types of this buyer — not just this sector. A city buys software and fire engines through the same purchasing office.
| Company | Awards | Period |
|---|---|---|
| Insinööritoimisto Leo Maaskola Oy | 16 | 2020–2026 |
| Lujatalo Oy | 14 | 2020–2024 |
| Skanska Talonrakennus Oy | 11 | 2020–2026 |
| Lujatalo Oy · KUOPIO | 10 | 2024–2026 |
| Uudenmaan Mestari-Rakentajat Oy | 9 | 2018–2025 |
How often this buyer tenders this kind of work
Tactics
When this buyer has awarded in this sector, usually 5 or more bids came in. Many compete here — price and references decide. (Based on 46 completed awards — not a statement about this procedure.)
This procedure allows 91 days between publication and deadline — typical in this country is 32 (median of 1,471 procedures). Much more generous than usual — time for a thorough bid rather than a quick one.
The deadline falls on a Monday — your last full working day is the Friday before. Have evidence and guarantees together by Thursday.
Foreign bidders
In Finland · Construction work, 5 contracts went to foreign companies over the last 3 years (of 4,931 recorded awards).
Submission language: Finnish.