Beam Loss Monitors (BLMs) for the SC Linac
Belgium · Mol · how to bid here →
Your path to submission
- Deadline: 16 November at 16:00 — 43 days left.
- The submission point is stated in the notice (link on the right).
- Offer and evidence in: FRA, ENG, NLD.
- Collect your evidence — the eligibility requirements are listed above; for many of them the analysis explains how to obtain them.
Clement What the numbers say about this buyer
- The median procedure drew 10 bids (140 procedures with a bid count); 17% ended with a single bidder. Sector: median 3 bids.n = 140
- In this sector the buyer awards roughly every 2 months (6 awards, most recently March 2026) — by that rhythm the next award was due around April 2026. The last award went to AFT microwave GmbH.n = 6
- 14% of this buyer's awards went to companies that had already won here before (161 awards since 2018, spread over 85 companies). 86% went to new names.n = 161 awards since 2018
- 32% of awards went to companies from abroad (161 awards with a known winner country). Sector average: 24%.n = 161
From this buyer's documented awards; comparison values from the same sector and country. Not a forecast, not legal advice. As of 04/10/2026.
Foreign bidders
In Belgium · Electrical machinery, 89 contracts went to foreign companies over the last 3 years (of 414 recorded awards) — mostly from France, Germany, Netherlands.
Submission language: FRA.
Typical field: median 1 (from 4 awards).
What the buyer is looking for
The summary in English is being prepared. The official description below is in the original language (FR).
Show original description (FR)
Beam Loss Monitors (BLMs) for the SC Linac for MYRRHA Phase I (MINERVA) 100 MeV proton LINAC
Selection criteria — in the procurement documents
The buyer states in the notice that the selection criteria are in the procurement documents (link on the right), not in the EU form. The document analysis below extracts them from there — bid and evidence in French, English, Dutch.
Contract
Who has won here before
| Company | Awards | Period |
|---|---|---|
| Process Automation Solutions | 3 | 2025–2026 |
| Brunel Belgium | 3 | 2025–2026 |
| Alten Belgium | 3 | 2025–2026 |
| Newpoint Professionals | 3 | 2025–2026 |
| Tüv Austria Belgium | 3 | 2025–2026 |
How often this buyer tenders this
Who knows the rhythm prepares instead of reacting.